Country : Germany
Summary : Contract notice: Architectural, engineering and planning services
TPD Ref No : 33806833
Document Ref. No. : 272502-2019
Financier : Self Financed
Purchaser : LANDKREIS MARBURG-BIEDENKOPF
Office Name: Landkreis Marburg-Biedenkopf
Address: Im Lichtenholz 60
Town: Marburg
Postal Code: 35043
Contact Point: Schönberger, Gerrit

Phone: +49 64214051932
Tender Details : Object of the contract
Architectural, engineering and planning services

Description: Contract notice: Architectural, engineering and planning services

Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Competitive procedure with negotiation
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 71240000,71240000
CPV Description: Architectural, engineering and planning services.
Project planning services for buildings in the course of the comprehensive renovation of Building B of Vocational Schools Biedenkopf
Reference Number: 2019002905
Project planning for buildings acc. Part 3, Section 1, HOAI in the course of the comprehensive renovation of Building B of the Vocational Schools Biedenkopf.
The district of Marburg-Biedenkopf intends the Klassto renovate building B at the Vocational Schools in Biedenkopf. It is a 3-storey class building which was built in solid construction. The inner core was manufactured in cast-in-situ concrete, the outer supporting structure made of precast reinforced concrete. In the area of the concrete core there is a ventilation system as well as the electrical distribution. On the flat roof is the Phoinstalled by a third-party operator. In addition to an energetic refurbishment and the implementation of a fire protection concept, as well as the pollutant survey, a comprehensive structural restructuring of the room layout should be implemented. Accordingly, the interior should be gutted and completely rebuilt. In the planning and implementation are the inclusion as well as the specificationsbarrier-free according to DIN 18024-1. An elevator was already realized in an intermediate construction. The existing floor plans show a large area of traffic areas, which have to be reduced with the reconstruction measures. The premises no longer meet the requirements of a contemporary pedagogy. The construction prerequisite for teaching for the entsPro-educational teaching needs to be created. It is intended to structure the various teaching areas into clusters or open learning areas. The areas should be able to be flexibly used and rebuilt.
It is intended to form the thermal enclosure in timber frame construction with a pre-ventilated fa-ade (suitable for passive houses). A cleaning system is expressly not erwuenscht. The facade should be placed in front of the old exterior construction (reinforced concrete construction). The old support structure is to be integrated into the thermal cover to protect the components from the weather and to obtain a virtually heat bridge-free Gebehudehuelle. The fa-ade construction will presumably be placed on new strip foundations / foundation beams. Depending onSpecification of the structural design, the strip foundations or foundation beams are placed on the Koecherfundamente. Sealing and damping of the base area are here the neuralgic points. The windows (wood-aluminum or aluminum only) with triple insulation and safety glazing, and external venetian blinds are to be installed airtight directly in the wooden facade and supplied with the modules. Thereby wed ensures airtight installation. An on-site installation is not desired.
The renewal of the flat roof waterproofing including impact-resistant insulation must be checked. On the roof surface is the photovoltaic system of an external operator. The discharge system of the lightning protection system should be integrated into the planned curtain wall.
The rainwater drainage system must be re-planned. DThe on-site rainwater drainage system is to be led outwards to the fa-ade. Due to the new spatial concepts (cluster & open learning landscape) and the necessary generous space, special attention must be paid to ensuring the second escape route. The inner area should be completely gutted. A pollutant analysis is currently commissioned. It ist with asbestos in the old outer envelope, KMF and formaldehyde in the old inner walls. The report should be available at the beginning of planning and must be observed during all work. Further measures are to be implemented with the measure:
- Renovation of student toilet,
- Production of a handicapped toilet,
- Production of changing areas for kitchen staff,
- Productionby Bueroflaechen for a media center.
The refurbishment aims to improve the building`s energy standard for compliance with ENEV 2016 in the direction of passive house components. However, certification is not the goal. In the overall planning and implementation, the minimization of vandalism damage should be sought in addition to the aforementioned points. The required explanationsand supporting documents must be submitted under compulsory use of the application form (see also VI.3). The declarations are, where required, legally binding to sign. All evidence and explanations must be in German. The evidence and the relevant documents must be clearly identified and according to the instructions in the instructionsthe application form. Submitted application documents will not be returned. The following evidence must be submitted with the application formally using the enclosed forms:
a) Details of the company with proof of the authorization of the engineer responsible for the project to manage the professional title of engineer (from the provider of the Leis(b) Declaration on - 73 (3) VgV (Independence of Execution and Supply Interests) Annex 1;
c) Explanation on - 6 (2) VgV (Economic Associations) Annex 2a;
d) Declaration on Paragraph 43 (3) of the VgV (Authorization of a representative of the grouping and joint and several liability in case of order) Annex 2b;
e) Declaration on - 123 (1) GWB (declaration that the company does not have any exclusion criteria according to items 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 of - 123 (1) GWB) Annex 3;
f) Declaration to - 124 Abs. 1 GWB (Declaration that for the company no exclusion criteria according to points 1, 2, 3, 4, 5, 6, 7, 8 and 9 of - 124 Abs. 1 GWB are present) Appendix 4.
About the required BewerbungsunterlaThe required information and declarations are to be issued and / or given to applicant / working groups of all members of the community. Applications for participation will only be considered upon presentation of the completed and signed application form. All verifications and explanations must aktube not older than 6 months from the date of publication. Excluded here are the proof of the authorization to manage the job title architect / engineer. For consortia, the required documents must be provided to all members, with each member having to prove his or her suitability for the part of the service that it is supposed to undertake. The upThe breakdown of the service components within the consortia must be indicated. Insofar as the applicant intends to pass on partial services to another company or another freelancer, corresponding proof and statements must be submitted to him / her which make the suitability test of the entrepreneur or freelancer possible for this partial serviceProfessional liability insurance in accordance with - 45 (4) VgV of an EU insurance company Annex 5.
The application for participation must be accompanied by evidence of existing insurance. In the case of lesser sums insured than mentioned in point III.1.2, an additional confirmation from the insurance company is required, which indicates that the sums are at least bib) declaration by the applicant in accordance with - 45 (4), sentence 4 VgV on total turnover (fees for building services for buildings and rooms) gross in million euros in the last 3 business years (2016, 2017 and 2018).
C) Explanation of the applicant in accordance with - 46 (3), sentence 8 VgV on the number of permanent employees for ObjektplanuAnnual average of the last 3 financial years (2016, 2017 and 2018) Annex 7.
The required information and explanations must be given or given to applicant / working groups by all members of the community. Applications for participation will only be considered upon presentation of the completed and signed application form. All the evidenceand statements must be up to date (not older than 6 months from the date of publication). For consortia, the required documents must be provided to all members, with each member having to prove his or her suitability for the part of the service that it is supposed to undertake. The breakdown of the service components within the consortia must be indicated.Insofar as the applicant intends to pass on partial services to another company or another freelancer, the corresponding supporting documents and declarations must be submitted to him / her for this part of the performance allow the suitability examination of the company or freelancer
For the evaluation of the participation process are the evaluating body Application documentsfinally to be submitted in writing. The application documents will not be returned. Free receipt of the digital documents at the contact address specified in Section I: "Sending tender documents and supplemental documents" or directly via www.had.de.A request by e-mail stating the procedure number and the contact information is sufficientthat the client can make any additional information available to all applicants.
For all the information and evidence mentioned in III.2.1 to III.2.3, it is mandatory to provide the forms contained in the "application form." Formal requests can not be considered and will be excluded from participation unless otherwise notedProofs sufficient. The required form of evidence and the detailed minimum requirements are to be found in the application documents to be requested and in this publication text. The application form including the required attachments and proofs must be submitted by each member of an application community as well as by each subcontractor. - 46 para. 3, sentence 10 VgV or - 47 VgVufuellen and submit.

Internet address (URL): https://portal.deutsche-evergabe.de
Deadline : 09 Jul 2019