TendersPedia
Search
Subscribe
English
Tender banner

Tender for Construction of New Generating in Poland - 147051096

Poland

Country

10 Sep 2026
Deadline
Expired
Status

Procurement Summary

Summary: Construction of New Generating Units with a Heat Accumulator at the Zawidawa Chp Plant

Posting Date: 12 Aug 2026

Deadline: 10 Sep 2026

Other Information

Notice Type: Tender

TPD Ref No.: 147051096

Document Ref. No.: 559985-2026

Financier: Self Financed

Tender Value: Refer Document

Document Fees: Refer Document

Purchaser's Detail

Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details.

Tender Details

Construction of new generating units with a heat accumulator at the Zawidawa CHP plant The subject of the order is: Construction of new generating units with a heat accumulator at the Zawidawa CHP plant. The order covers the implementation of the task on a turnkey basis, consisting of: on the design, delivery, construction, assembly, integration with the existing technological system, commissioning, commissioning and commissioning of the following generating sources and accompanying systems: - A boiler room consisting of energy-powered boilers electricity (e.g. electrode boilers, resistance boilers) with a total power of not less than 10 MWt and efficiency of not less than 97%. Attention should be paid to the power supply system of the new ZAWIDAWIE CHP plant. Available reception powers from the TAURON 3 MV connector and SN TAURON 4 are different. This fact should be taken into account when designing the boiler power supply system. Details of available capacity will be specified in the Connection Conditions. For EKW to operate with maximum power, it will be necessary to support it with its own generation from generators Cogeneration. - A heat accumulator in the form of a steel cylindrical tank with a net usable capacity of not less than 2,000 m3, - Cogeneration unit (AK4) with a capacity of 4.5 MWe (the Order does not include the Delivery of AK4), - Fire protection water tank, - Change connection point of existing AK1, AK2, AK3 Cogeneration Units, - BoP supporting infrastructure. Doc Title: Construction of new generating units with a heat accumulator at the Zawidawa CHP plant Con...

Documents

If you are registered member, kindly login to view full details of this tender notice:

Login

Location for : Listing Title