Country : Germany
Summary : Contract notice: Architectural, engineering and planning services
TPD Ref No : 30608126
Document Ref. No. : 068406-2019
Financier : Self Financed
Purchaser : DB NETZ AG (BUKR 16)
Office Name: DB Netz AG (Bukr 16)
Address: Theodor-Heuss-Allee 7
Town: Frankfurt-on-Main
Postal Code: 60486
Contact Point: Waldherr, Astrid

Phone: +49 89130872592
Fax: +49 89130872858
Tender Details : Object of the contract
Architectural, engineering and planning services

Description: Contract notice: Architectural, engineering and planning services

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 71240000,71240000,71240000
CPV Description: Architectural, engineering and planning services.
Renewal EUe Tumblinger Str. Km 5,511 Route 5510 Muenchen-Rosenheim Planning IBW and TWP Lph 1 2 (optional Lph 3 4 6 7 9)
Reference Number: 18FEI35808
Renewal EUe Tumblinger Str. Km 5,511 Route 5510 Muenchen-Rosenheim Planning IBW and TWP Lph 1 2 (optional Lph 3 4 6 7 9)
Main Site: Munich
The existing railway overpass is located sion the two-track lines 5510 and 5531, and is due to the poor structural condition to renew. With the existing on the EUe station / Rangiergleisen are a total of 17 tracks on the bridge. In the course of the construction of the new building, an expansion of the railroad overpasses is required of the road construction carrier of the state capital of Munich (LHM). It is thus an EKrG measure according to -12.2. The renewal of the railroad overpasses is scheduled for 2025. The maintenance of the main line 5510 during the construction period (Munich Hbf Rosenheim) is to be pursued as a target. A restriction of the sidings is temporally and locally limited after sufficiently long announcement according to current knowledge possible. The at the south bridge portalThe adjacent supporting structure running parallel to the Thalkirchner Str. is part of the railway transfer and part of the planning. For the on the northern bridge portal over the Tumblinger Str. Transferred service route is currently a dispensability test instead. For planning, this part of the bridge as Zufahrtweg thus possibly abgengig and not (or only partially for Randwegshe
Design of civil engineering structures, - 43 HOAI, according to Annex 1.1 ... Lph 1 to Lph 2
Structural design of civil engineering structures, - 51 HOAI, according to Annex 1.2 ... Lph 2
- Declaration that no insolvency or liquidation proceedings are pending,
- Declaration that the company is in respect of exclusion in the sense of -- 123 f. GWB or eligibility criteria inMeaning of - 122 GWB has committed no deception and also no information retained and that the company has always been able to provide required evidence in relation to -- 122 to 124 GWB,
- Statements on compliance with legal obligations, in particular the obligation for the payment of taxes and levies as well as for the payment of the contributions to the statutory social insuranceng (pension, health, care, accident and unemployment insurance), as well as obligations z. B. gem. the regulations referred to in - 21Worker-Posting Act (AentG), - 98c Residence Act, - 19 Minimum Wage Act or - 21 Illicit Work Code
Further required explanations / proofs see point VI.3
Subcontractors, who are responsible for the proof of technical performancemust be mentioned in the application for participation and must not be exchanged during the award procedure. An exchange of these fundamentally leads to the exclusion of the applicant. In addition, the applicant must provide written evidence in the attached undertaking (Annex 1) stating that he will actually receive the funds for the entire duration of the servicesubcontractor for the provision of the respective service. An exchange of subcontractors, which are used for the achievement of the suitability requirements, is generally not permitted during the entire duration of the service provision and only for compelling reasons admissible. Prior to the exchange of subcontractors, the written consent of the client must be obtained. DIn addition, all forms from the procurement procedure for the respective subcontractor must be enclosed with a written request for exchange. The exchange is only permissible against subcontractors who are suitable and equivalent in accordance with the local regulations.
- Declaration of misconduct that calls into question the reliability as a bidder (- 124 (1) No. 3 GWB), - Declaration on antitrust lawn compliance and corruption prevention,
- statement that he is not blocked by the Deutsche Bahn AG for misconduct and excluded from the competition,
- statement on the employment of employees of DB Group (active and no longer active as pensioners and retirees) and on the economic or financial participation in the enterprise of the tenderer of persons, iee also maintain an employment relationship with a company of the DB Group,
- declare that the company has at no time attempted to reach a decision in a procurement procedure of Deutsche Bahn AG by a company affiliated with it in accordance with -- 15 ff to improperly influence,
b) to obtain confidential information, dit could obtain inadmissible advantages in the procurement process; or (c) provided misleading information that could or did influence the award decision.
- declare that the candidate / tenderer has approved the DB Code of Conduct for Business Partners (http: // www.deutschebahn.com/lieferantenqualifizierung_downloads) or the BME Code of Conduct (https: //www.bme.de / fileadmin / _horusdam / 2065-BME-Code_of_Conduct_english.pdf) or its own Code of Conduct, which essentially sets forth comparable principles binding on it,
- declare that the turnover for technical planning (object and structural design) constructive engineering in the railway industry in the Average of the last 3 completed business years (2015, 2016 and 2017) per year at least
The client reserves the right to apply -- 123, 124 GWB.
From 19.4.2017, only the submission of offers / participation requests via the public procurement portal of the SektVO and more than EUR 50,000 will be granted Deutsche Bahn AG.
As a condition of participation by the economic operator, in addition to the declaration mentioned under III.1.1 to III.1.3/ Proof of the following further explanations / evidence required:
- Declaration as to whether and to what extent we are affiliated with the below-mentioned other companies commissioned by the AG for this project (in terms of company law within the meaning of - 18 AktG / kinship) or economically dependent. For consortia, this obligation applies to each individual community1st member,
- 1. DB Engineering and Consulting GmbH
The client reserves the right to exclude offers from bidders that have been created with the assistance of an engineer`s office commissioned by the client. The same applies if there is a corporate / family affiliation or economic dependence between the bidder and the appointed engineerRequested declarations / proofs
All required explanations / proofs are mandatory, a reference to previous applications will not be accepted.
Listing after o. g. Sequence summarized briefly and precisely in an appendix. Only this information will be considered for bidder selection. Any further documents are not required.
All under III.1.1 to III.1.3 and VI.3 required declarations / proofs must be submitted in the open procedure with the offer and in a call for participation in the application for participation.
The client reserves the right to apply -- 123, 124 GWB.
When submitting a participation application or bid, in the form of a consortium, the consortia should pre-register in the allocation portal of DB AGget registered. Participation in the procedure presupposes the unchanged composition of the consortia admitted to the contest. The merger of the individual bidders admitted to the bidding consortium in the participant competition is permitted.
Questions regarding the tender documents or the award procedure must be submitted in good time so that the contracting authority can take account of themIt shall be possible to reply to it within 6 days at the latest before the deadline for the submission of tenders or the submission of participation requests. The client reserves the right not to answer questions that are not answered in good time or within less than 6 days before the deadline for the submission of tenders or the submission of the application forms
Internet address (URL): http://www.deutschebahn.com/bieterportal
Deadline : 11 Mar 2019
Documents : Download