"Construction of a heat pump system and an electric boiler with accompanying infrastructure at the "Czeczott" Heating Plant in Wola." The subject of the investment order is the implementation of the task entitled: "Construction of a heat pump system and an electric boiler with accompanying infrastructure at the Czeczott Heating Plant in Wola", as part of the implementation of which a new energy facility will be built in the boiler room of the Czeczott Heating Plant in Wola, consisting of a system heat pumps and electric boilers as well as auxiliary installations and devices. The subject of the order includes, among others: preparation of construction and detailed designs, deliveries, construction and assembly, commissioning and commissioning of the Facility, including: training the Ordering Party's staff, warranty service of the Facility. The subject of the order includes in particular: • installation of a high-temperature electric boiler with a capacity of not less than 2 MW, • installation of an air/water heat pump system with a total power of no less than 5 MW, • delivery and installation of auxiliary equipment and accompanying infrastructure, • assembly and construction works, including: dismantling, construction, electrical, sanitary and instrumentation works, •adaptation of facilities and installations to meet fire protection requirements, • integration of the system with newly built gas sources (gas cogeneration unit 2.096 MWe / 2.042 MWt and gas boiler 2.5 MW) and the WR-25/3 boiler (12.0 M...
- 11 May 2026
- 140431274
- Refer Document