TendersPedia
Search
Subscribe

construction-mining-and-earth-moving-machinery Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 1272

1 The Contractor undertakes to sell and deliver to the Ordering Party for remuneration (delivery), on the terms specified in the contract, 1 piece of the DEKO2-55z dragline reel, hereinafter also referred to as the subject of the order.2 The dragline reel with full documentation adapted for operation in underground mine workings in a potentially explosive atmosphere, it should have the following parameters: a) type of electric motor DSg-250M4, b) maximum motor power. 55 kW, c) engine speed 1450 - 1500 rpm) rope diameter 16 - 18 mm, e) length lines of 125 - 200 m,f) gallon dimensions.: a long 1320 - 1540, a range of 1640 - 1785, a high 760 - 100 mm,g) mass of cocky cake through lines of 2200 - 3130 kg,h) the typical typical: 3130 kg,h) typth mesh: IT triphs with isolated the zero-screen character,i) voltage powers: 500 [V],j) protection level IP 54.3 The cabin should be equipped with: a) two systems of control levers, b) a gearbox adapted to the medium operation mode (Z1 = Z2 with an average pulling force of 19 kN and a return force of 14 kN), c) with additional 2 sets of flexible couplings d) with 2 sets brake discs lined with feroda lining. 4 The supplied scraper wheel must: a) be compatible with ...

  • 17 Feb 2026
  • 135194552
  • Refer Document

The procurement refers to the hiring of factory-new construction machines (frame-controlled wheel loaders) without drivers to be used for the execution of tasks mainly at the Filborna Recycling plant in Helsingborg, but also at NSR's other facilities in the northwest Skåne. Rental of construction machinery without driver Doc Title: Hire of construction machinery without driver Contract Type: supplies

  • 06 Mar 2026
  • 135190653
  • SEK 20000000

Supplies of three pumps and speed variators for the SST steam/hot water exchange station. The pumps supply a hot water loop in the Ariane district of Nice. The total available power of the exchange station is 14 MW for a deltaT=25°C in winter, for the development of this loop. Supply of pumps and speed variators for the SST Arianeo steam/hot water exchange station in Nice Est By a public service delegation agreement concluded on 01 July 2022, the community of the municipality of Perpignan entrusted Dalkia with the management of the public service for the construction and operation of a heating network on part of the territory of the municipality of Perpignan. As part of its concession, DALKIA must carry out work in 2026/2027 to transform 15 existing boiler rooms into substations. This consultation concerns the supply of substation exchangers. Doc Title: Supply of pumps and speed variators for the station steam/hot water exchange of SST Arianeo in Nice Est Contract Type: supplies

  • 23 Feb 2026
  • 135189151
  • Refer Document

"Delivery of 1 (one) new combined excavator-loader for the needs of the Municipality of Stara Zagora" The specification, technical characteristics of the combined backhoe loader, the subject of delivery and the requirements and conditions for performance, etc., are contained in The technical specification. Note: ***Important: Wherever in the technical specification, documentation and documents where there is a reference to a specific model, source or specific process that characterizes the products offered by a particular potential contractor, or trade mark, patent, type or specific origin or manufacture, which would lead to the benefit or elimination of certain persons or certain products, to be read and understood with the supplement or equivalent ​​​​​​​ Doc Title: "Delivery of 1 (one) new combined excavator-loader for the needs of the Municipality of Stara Zagora" Contract Type: supplies

  • 10 Mar 2026
  • 135188644
  • EUR 102207.25

The subject of this public procurement is the supply by purchase of a track unit (track) for SRs 2000, made according to construction documentation of the Contracting Authority - drawing. No. 530.726.999:003 RB, according to the requirements and conditions specified in the Technical Specification of the order. Quantity: 400 pieces. The requirements of the Employer to the subject of the order are described in detail in the Technical Specification and the participation documentation. Delivery of track unit (track) for SRs 2000 The subject of this public procurement is delivery by purchasing a track unit (track) for SRs 2000, made according to construction documentation of the Contracting Authority - drawing. No. 530.726.999:003 RB, according to the requirements and conditions specified in the Technical Specification of the order. Quantity: 400 count. The requirements of the Employer to the subject of the order are described in detail in the Technical Specification and the participation documentation. Doc Title: Delivery of Track Unit (Track) for SRs 2000 Contract Type: supplies

  • 10 Mar 2026
  • 135188418
  • EUR 1332426.64

The subject of the order is the delivery of one piece of a brand new wheeled telescopic loader from mass production, together with the required equipment and completion, as well as technical documentation and training, hereinafter referred to as equipment or device.

  • 13 Feb 2026
  • 135188240
  • Refer Document

1. The subject of the order is the expansion of the playground at the Municipal Integration Center in Stalowa Wola at ul. Poniatowskiego 55a as part of the Active Places of Play program.2. The subject of the order includes: - reconstruction of the playground with the construction of a new surface safe, - installation of small architecture elements, - implementation of plantings, - obtaining a document (certificate) from the inspection confirming compliance of the playground and surface with the PN-EN 1176 or 1177 Standards (this document must be issued by an independent, specialized, an external inspection entity that was not directly involved in the installation and is not responsible for any repair work and related expenses).3. The task should be carried out in accordance with the DNSH principle within the meaning of Art. 17 of Regulation (EU) No 2020/852.4. WITH Due to the fact that the works will be carried out on the premises of the Municipal Integration Center, the Contractor will be obliged to carry out the works in a way that ensures safety and does not disrupt the functioning of the facility.5. The detailed scope of the order is specified in Design documentation, SST, Bills of Quantities, constituting annexes to SWZ.6. The task is co-financed under the R...

  • 25 Feb 2026
  • 135187954
  • Refer Document

Location for : Listing Title