The purpose of the tender is to select a Contractor who, via a 2-Phase approach, see the explanation below, will provide a detailed technical specification (TO) of the retractable overhead line with which the retractable overhead line can be delivered in an integrated manner. Afterwards, if the Parties agree on the realization phase, the realization of the new retractable overhead line for the new metro workshop, as further described in paragraph 1.3, will be carried out in accordance with the requirements, wishes and specifications of RET. Fold-away overhead line for the new metro depot The purpose of the tender is to select a Contractor who will provide a detailed technical specification (TO) of the retractable overhead line, with which the retractable overhead line can be delivered in integral working order. Afterwards, if the Parties agree on the realization phase, the realization of the new retractable overhead line for the new metro workshop, as further described in section 1.3, is carried out in accordance with the requirements, wishes and specifications of RET. Doc Title: Retractable overhead lines for the new metro depot Contract Type: works
-
12 Mar 2026
-
134630054
-
Refer Document