Services are paid by fixed prices Supply and delivery of a road-rail excavator Doc Title: Supply and delivery of a road-rail excavator Contract Type: supplies
- 16 Feb 2026
- 133651826
- Refer Document
Subscribe
Services are paid by fixed prices Supply and delivery of a road-rail excavator Doc Title: Supply and delivery of a road-rail excavator Contract Type: supplies
OBJECT OF PROCUREMENT The object of the procurement is the delivery of Process Line 1 EPS (EPS = Engineering, Procurement and Supply incl. installation) of the GTK Mintec pilot plant construction project. The EPS supplier is responsible for the overall delivery of process line 1 during the implementation phase of the project in accordance with the plans provided by the plant designer. The preliminary schedule for the project is 2026-2028. Appendix 1 of the request for participation "Project description" describes the procurement object at a general level as well as the project's schedule and planned progression. SCOPE OF PROCUREMENT The preliminary, non-binding estimate is around 20 - 40 M€. See also appendix 1 "Project description" of the request for participation. GTK Mintec Uusi Koetehdas Process Line 1 Procurement of EPS delivery OBJECT OF PROCUREMENT The object of the acquisition is GTK Mintec -EPS delivery of Process Line 1 of the pilot plant construction project (EPS = Engineering, Procurement and Supply incl. installation). During the implementation phase of the project, the EPS supplier is responsible for the overall delivery of process line 1 of the plans provided by the plant designer in accordance with. The preliminary schedule for the project is 2026-2028. Appendix 1 of the request for participation "Project description" describes the procurement target at a general level, as well as the project's schedule and planned progress. SCOPE OF PROCUREMENT The preliminary, non-binding estimate is approx 20 - 40 M€. See also appendix 1 "Project description" of the request for participation. Doc Title: GTK Mintec Uusi Koetehdas Process Line 1 Procurement of EPS supply Contract Type: supplies
The subject of the public contract is the design and implementation of water purification technology for a natural swimming pool so that water quality and other related parameters meet the requirements of generally binding legal regulations, applicable technical standards and this procurement documentation including its attachments. Part of the scope of performance is the processing of complete project documentation for the water treatment technology facility (PS 04) in accordance with the relevant legal regulations as a basis for making changes to the plan before completion, including ensuring the opinion of the public health protection authority. Furthermore, the processing of documents for the modification of the project documentation for the implementation of the construction and for the completion of the construction works in relation to the 2nd and 4th stages of the construction of the natural swimming pool, including the provision of the necessary cooperation between the client and the contractor of these design works, the implementation of related earthworks and the commissioning of the supplied water purification technology, including subsequent support during operation. The fulfillment will be divided into 4 phases. Content of individual phases, including deadlines, in in which these phases are to be implemented is specified in detail in Annexes No. 1 and 3 of the procurement documentation. A detailed definition of the subject of the public contract, including technical conditions in the details necessary for the processing of the offer, is given in the appendices procurement documentation. Burk natural swimming pool - water purification technology The subject of the public contract is the design and implementation of water purification technology for a natural swimming pool so that water quality and other related...
Project Type : Services
Multi Lot Project :No
Detailed_Description : The Ministry of Public and Business Services Delivery and Procurement (MPBSDP) wishes to notify the vendor community of a possible upcoming Request for Bids (RFB) for the delivery of VMware Software Continuity and Maintenance Support Services to secure provisions for VMware software maintenance, support services, and related products and services necessary for operational continuity which includes but is not limited to: •VMware Cloud Foundations software subscriptions, renewals, and licensing;•VMware Avi Load Balancer•VMware vDefend Firewall•Technical support and security updates •Technical Account Management services; and•Training and knowledge transferThese products and services are expected to be provided for a term of up to three (3) yearsA Request for Bids (RFB) is anticipated to be issued in March of 2026, via the Ontario Tenders Portal (OTP)This notice, including any timetables, is for information purposes only, does not constitute a solicitation and shall not give rise to any legal rights or duties. The RFB may differ from the information contained in this Pre-Release Notice. The Ministry reserves the right to cancel or modify this planned procurement at its sole discretion.If MPBSDP proceeds with the procurement, MPBSDP will post the RFB on OTP, which is an electronic tendering system that is open to all bidders. This notice should not be construed as a RFB or as creating any legal obligation to issue a RFB or to undertake any other procurement process. No response is required. The target date for issuance of an RFB is estimated to be in March 2026. MPBSDP reserves the right to not proceed with the procurement mentioned in this notice, without any responsibility, liability or obligation to any interested parties. Neither MPBSDP nor the Government of Ontario will be responsible for any costs incurred by any person or organization as a result of this communication.
Scope of Work : The objective of this VMware Operational Continuity Software Maintenance and Support Services RFB is to provide the Ontario Public Service (OPS) the ability to purchase additional software licenses to maintain compliance with licensing terms and conditions, as well as acquire annual maintenance and support that is needed to ensure applications run free from any defects or security flaws. The VMware Operational Continuity Software Maintenance and Support Services RFB is intended to establish an agreement with a single vendor that will: •Be capable of providing a wide range of VMware software products and maintenance and support; and •Improving the visibility and intelligence around software agreements across the Ontario Government, enabling strategic management of licenses and related services.
Project Categories :43231500-Business function specific software
43232600-Industry specific software
43232700-Network applications software
43232800-Network management software
43232900-Networking software
43233000-Operating environment software
43233200-Security and protection software
43233400-Utility and device driver software
81112200-Software maintenance and support
The demolition, existing and new construction of the state vocational school I in Bayreuth extends over three construction phases. The scope of services of the workshop furniture awarding unit covers construction phase BA1 and may include sampling in advance. The Machines and furniture are delivered by the supplier and brought into the building and delivered to the appropriate place of use. Delivery and assembly may take place in several phases in consultation with the responsible subject teachers. The introduction takes place on the ground floor via the external gates or main entrance. This is followed, if necessary, by the commissioning/testing of all functions and instruction on how to operate the individual components. The scope of delivery may include a maintenance service for all of the equipment described contain. The actual performance and minimum requirements for the machines are described. During assembly, interfaces may arise with the electrical and HLS trades. The coordination surcharges with the other trades depend on the positions calculate. The available construction area (safety area) is limited; the existing buildings on three sides are in use during the work. If necessary, the assembly concept must be drawn up according to the limited local conditions. The Safety of the adjacent buildings must be guaranteed at all times. New building of the state vocational school I, Bayreuth - 6031 Workshop furniture carpenter carpenter BA 1 The demolition, existing and new construction of the...
Spare parts for construction machines with installation and service
Procurement of a disc saw for branches
Münster, research production battery cell 2.BA Fab; Truck loading docks
Delivery of 2 waste collection vehicles, rear loader, 2-axle