Go: 202507280- Renovation work on the refectory and sanitary facilities of the comprehensive school located at 16 Rue Vicq d'azir 75010 Paris
- 06 Mar 2026
- 135690443
- Refer Document
Subscribe
Go: 202507280- Renovation work on the refectory and sanitary facilities of the comprehensive school located at 16 Rue Vicq d'azir 75010 Paris
Berneslai Homes requires one suitably experienced contractor for the replacement of 139 roofs across the Barnsley Borough, including all associated building works, at BMBC-owned domestic properties in various locations. The Contractor is responsible for providing all labour, materials, and equipment required to complete the works and for removing all waste generated. Scaffolding will be supplied through Berneslai Homes- contracted providers. All works must be carried out in accordance with the detailed performance specification, including any necessary builders- work and making good of existing structures. Tender documents for this procurement must be downloaded from the YORtender e-Tendering system after log on and expression of interest has been made https://yortender.eu-supply.com/
CPV classifications: 45261900 - Roof repair and maintenance work45000000 - Construction work
Public Contract for Development Works for the Courtyard of the Town Hall of the 13th Arrondissement Located 1, Place d-Italie 75013 Paris
Operation 202316886: Renovation work with external thermal insulation of the facades of the nursery school located at 91, Rue De La RΓ©union 75020
Sheet metal, roofing and carpentry works
Provision of road closures, erection and dismantling of up to 35 no. market stalls (supplied by the Town Council), market stall storage & delivery and minor waste clearance pertaining to Mablethorpe weekly market (Thursdays - Easter to Christmas).
CPV classifications: 45213142 - Open-air market construction work
Extraordinary maintenance LC 65080; section: Visoka - border with Split-Dalmatia county
The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise: β’ Necessary surveys, and investigations and monitoring. β’ Demolition of remaining buildings (including the existing Guildford Council Depot) β’ Vegetation clearance, tree felling and site strip β’ Topsoil stripping β’ Sitewide remediation of contamination (where required) β’ Site platform and levelling β’ Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors β’ Swales and attenuation basins β’ Surface water outfalls β’ Utility infrastructure, ducting, chambers, pipework β’ Highway formations β’ Signage, markings, street furniture, street lighting β’ Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements β’ S278 Junction Works β’ Maintain the reptile translocation fencing and associated inspections Location Location of Project: β’ Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG. β’ Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council-s Depot site, Guildford GU1 1QE. β’ Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being unde...
Construction of the Pirovac fire station - repeated procedure
Construction work related to the installation of pipelines (45231110)