A9 Pyhrn motorway, small construction measures ABM Ardning 2026 - construction work Information about the announcement: This project involves various small construction measures (small area renovations and joint grouting work on asphalt pavements, concrete repair work, Drainage work, protective structures, traffic signs, etc.) as well as repair work on water protection systems in the area of the A09 Pyhrn Autobahn were implemented. The aim of the current construction project is to repair all of ASFINAG's facilities Section between km 24,500 and 93,027 on the A09 Pyhrn Autobahn. The planned repair work and the preambles contained in the LV are based on a preliminary investigation by the client. If the actual situation deviates from the expected situation, keep it The AG reserves the right to make changes to the contract in order to ensure the goal of repairing the section of the route. Master number: FN92191a Business number: 149340 CPV main part: 45000000 (construction work)
- 09 Mar 2026
- 135737404
- Refer Document
