B 248 OD Mellin, conversion and expansion of construction site setup and clearing, traffic safety, road construction, 6,040 m² of asphalt demolition, 410 m³ of pitch paving, 3,100 m² of concrete paving, 3,900 m of curbs, 1,560 m of 2-line gutter, 2,120 m³ of soil solve, take up 2,435 m³ SoB, produce 12,700 m² of planum, 3,365 m³ FSS, produce 7,520 m² STS, produce 6,110 m² AC 32 TS, AC 22 BS, AC 11 DS, produce 520 m² AC 32 TN, AC 11 DN, 275 m² MA 8 S manufacture, 405 m² AC 32 TN, AC 5 DL manufacture, 2,075 m Create asphalt joint, 62 pieces of road gullies, install 355 m of DN 150 connection lines, 3,780 m² of concrete paving, 3,080 m of curbs, 1,500 m of 2-row gutter, install 200 m of FB 20*25 adhesive curbs, install 10.5 m of frame passage 1m*0.5m, 235 m of angle support elements, 200 m of steel railings, install rainwater, 2 rain retention systems (storage boxes), 2 sedimentation systems, 480 m of pipes up to DN 300, expand 77 m to DN 500, dam 150 m of pipes DN 300 - DN 400, 270 m Manufacture PP pipe up to DN 250, make 540 m pipe of reinforced concrete DN 300, make 266 m pipe of reinforced concrete DN 400 - DN 500, install 18 control shafts DN 1000 drinking water/SW 715 m pressure pipes PE 100-RC, SDR 11, DN 100, 115 m Install pressure pipes PE 100-RC, SDR 11, DN 50, install 130 m controlled horizontal drilling (HDD) for PE 100-RC with protective jacket DN 100, 24 pressure tapping valves DAV 125/32 and 210 m PE 100-RC pipe, SDR 11, 32*3mm (house connections), 17 pieces manhole covers replace D400, Construction work (CPV code: 45000000)
-
10 Mar 2026
-
135736416
-
Refer Document