TendersPedia
Search
Subscribe

construction-work Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 32485

1. The subject of the order is the reconstruction, expansion and roofing of the stands with photovoltaics and energy storage, which will consist in: - removal of the existing seats together with fastening elements and concrete seat bases; - reconstruction of the stands structure, replacing the seats with new ones and installing barriers at the extreme entrances to the stands and behind the last row of seats; - roofing the stands with a steel roof based on steel poles; - installing photovoltaic panels on the stands roof and placing the energy storage with the inverter on a structural pole; - hardening the area with paving stones. As part of the order, an as-built inventory should be performed.2. The detailed scope of the subject of the order is specified in the Bills of Quantities and Cost Estimates tenders, technical documentation and the Detailed Technical Specification constituting annexes to the specifications of the order conditions.

  • 02 Mar 2026
  • 135803404
  • Refer Document

1. The scope of the subject of the order includes the reconstruction of municipal road No. 106811B (ul. Eromskiego in Kleosin) consisting in the construction of a speed bump on plots no. 323/2, 114/1 and 306/1 in the Kleosin district. 2. A detailed description of the subject of the order is included in specification of the terms of the order and the attached design documentation, and the documentation constitutes Annex No. 2 to the SWZ.

  • 03 Mar 2026
  • 135803402
  • Refer Document

The subject of the order is the performance of construction works: Removal of snowbanks and replacement of a section of the bituminous surface of district road No. 3253P on the Gadowskie Holendry Sarbicko section, section with a length of 1,100.00 m1) preparatory works2) asphalt concrete overlay road surface structure 3) road shoulders 4) finishing works The detailed description and scope of the subject of the order is determined by: a) Bid cost estimate/bill of quantities - Appendix No. 1a to SWZb) Technical Specification for the Execution and Acceptance of Construction Works - Appendix No. 9 to SWZc) Draft provisions of the contract (draft contract), Annex No. 6 to SWZ

  • 02 Mar 2026
  • 135803391
  • Refer Document

The subject of the order are works related to the modernization and asphalting of municipal roads in the Zakliczyn commune. The detailed material scope is detailed below, within individual parts: Part I: 1. Modernization (asphalting) of municipal road No. G16 in the town of Charzewice2 Modernization (asphalting) of plot no. 185/5 in Faliszewice3 Modernization of the municipal road (asphalting) G9 (in the town of Melsztyn)4 Modernization (asphalting) of the municipal road no. 203375K (in the town of Roztoka)5 Modernization (asphalting) of the internal road on plot no. 54/2 (in town Roztoka)2. A detailed description of the subject of the order is included in the OPZ (attachment no. 6 to the SWZ) and the bill of quantities of the works, constituting an annex to this Specification of Terms of Order, hereinafter referred to as the SWZ (appendix no. 5). Valuations should be prepared on the basis of the above. documents. The bills of quantities constituting an annex to the SWZ are of an auxiliary nature.

  • 02 Mar 2026
  • 135803388
  • Refer Document

The subject of the order is the preparation of design documentation for street lighting and the construction of 33 new LED lamps in the city and commune of Roda lska in the design and build form. Scope of the subject of the order: The scope is to include the following locations: 1. plot no. 520; AM-2; obrb 5; Ciechw, ul. Short 3 lamps, steel poles (see no. 1);2. plot no. 544/28; AM-2; obrb 5; Ciechw, ul. Jagodowa 5 lamps, aluminum lamps (see no. 2);3. plot no. 762/1, 705/2; AM-1; obrb 23; Szczepanw, ul. Duga 7 lamps, steel supports (za. no. 3), including 2 lamps at a pedestrian crossing;4. plot no. 119; AM-1; obrb 27; Zakrzw 3 lamps, steel poles (za. no. 4);5. plot no. 67/6; AM-3; obrb 2; roda lska, ul. Klonowa 3 lamps, steel bases (no. 5)6. plot no. 54, 57/1; AM-14; rb 1; roda lska, ul. Kolejowa (raised pedestrian crossing) 2 lamps, steel poles (za. no. 6)7. plot no. 1/1, 3; AM-28; obrb 3; roda lska, ul. Gruszkowa/Winogronowa 10 lamps, steel poles (attachment no. 7) Scope of the study: The scope of the study includes the construction of the poles, routing of the luminaire's power cable, good protection, protection against electric shocks, and method of powering lighting fixtures. Conceptual location...

  • 03 Mar 2026
  • 135803378
  • Refer Document

The scope of the investment includes in particular: Construction of an outdoor pitch with a grass surface. Construction of sports infrastructure: grandstand, traps, fencing, lights for reserve players, pitch equipment, Hardening the area, Lighting the area, Construction 2 cloakroom buildings with a sanitary facility and internal installations, development of the area around the cloakroom buildings in the form of hardening the area, a pergola between the buildings, outdoor stairs, field planters, construction of connections and external installations, a hydrant, internal power lineA place intended for collecting waste,Ornamental and insulating herbs.Detailed description of the subject of the order according to the design documentation.The task is ready for implementation.The task will be implemented based on 2 decisions about building permit

  • 03 Mar 2026
  • 135803369
  • Refer Document

1. Part I under the name: Reconstruction (modernization) of residential premises with the addresses: a) ul. Kalwaryjska 53/2 building permitb) ul. Kalwaryjska 53/6 building permit) ul. Kalwaryjska 63/I/11.2. Reconstruction (modernization) of the housing stock of the Piekary lskie commune w buildings administered by the Housing Management Company in Piekary lskie, consisting in performing general construction works on water, sewage and electrical installations in each apartment, in particular: dismantling the existing doors to the premises and interior doors, dismantling the existing equipment of the premises, dismantling the existing heat sources, replacing window frames, separating a sanitary room (bathroom), installing a new electrical, water and sewage installation, installing room heating devices, finishing layers of floors, walls and ceilings, installation of new entrance doors and interior doors, installation of bathroom and kitchen utensils, toilet bowl, shower, washbasin, sink, electric stove, electric heaters and hot water heater. In the apartments of parts Ia, b, part IIa, part III b,c,d, the works covered by the permit must be performed...

  • 03 Mar 2026
  • 135803357
  • Refer Document

Location for : Listing Title