Renovation of the surface of provincial road No. 686 Zajma-Michaowo-Jawka at km 36+100 to 37+500.
- 05 Mar 2026
- 135803399
- Refer Document
Subscribe
Renovation of the surface of provincial road No. 686 Zajma-Michaowo-Jawka at km 36+100 to 37+500.
ELW 0028 - Äppelallee Canal renewal and road construction
The subject of the order is the performance of construction works: Removal of snowbanks and replacement of a section of the bituminous surface of district road No. 3253P on the Gadowskie Holendry Sarbicko section, section with a length of 1,100.00 m1) preparatory works2) asphalt concrete overlay road surface structure 3) road shoulders 4) finishing works The detailed description and scope of the subject of the order is determined by: a) Bid cost estimate/bill of quantities - Appendix No. 1a to SWZb) Technical Specification for the Execution and Acceptance of Construction Works - Appendix No. 9 to SWZc) Draft provisions of the contract (draft contract), Annex No. 6 to SWZ
The subject of the order are works related to the modernization and asphalting of municipal roads in the Zakliczyn commune. The detailed material scope is detailed below, within individual parts: Part I: 1. Modernization (asphalting) of municipal road No. G16 in the town of Charzewice2 Modernization (asphalting) of plot no. 185/5 in Faliszewice3 Modernization of the municipal road (asphalting) G9 (in the town of Melsztyn)4 Modernization (asphalting) of the municipal road no. 203375K (in the town of Roztoka)5 Modernization (asphalting) of the internal road on plot no. 54/2 (in town Roztoka)2. A detailed description of the subject of the order is included in the OPZ (attachment no. 6 to the SWZ) and the bill of quantities of the works, constituting an annex to this Specification of Terms of Order, hereinafter referred to as the SWZ (appendix no. 5). Valuations should be prepared on the basis of the above. documents. The bills of quantities constituting an annex to the SWZ are of an auxiliary nature.
The subject of the order is the preparation of design documentation for street lighting and the construction of 33 new LED lamps in the city and commune of Roda lska in the design and build form. Scope of the subject of the order: The scope is to include the following locations: 1. plot no. 520; AM-2; obrb 5; Ciechw, ul. Short 3 lamps, steel poles (see no. 1);2. plot no. 544/28; AM-2; obrb 5; Ciechw, ul. Jagodowa 5 lamps, aluminum lamps (see no. 2);3. plot no. 762/1, 705/2; AM-1; obrb 23; Szczepanw, ul. Duga 7 lamps, steel supports (za. no. 3), including 2 lamps at a pedestrian crossing;4. plot no. 119; AM-1; obrb 27; Zakrzw 3 lamps, steel poles (za. no. 4);5. plot no. 67/6; AM-3; obrb 2; roda lska, ul. Klonowa 3 lamps, steel bases (no. 5)6. plot no. 54, 57/1; AM-14; rb 1; roda lska, ul. Kolejowa (raised pedestrian crossing) 2 lamps, steel poles (za. no. 6)7. plot no. 1/1, 3; AM-28; obrb 3; roda lska, ul. Gruszkowa/Winogronowa 10 lamps, steel poles (attachment no. 7) Scope of the study: The scope of the study includes the construction of the poles, routing of the luminaire's power cable, good protection, protection against electric shocks, and method of powering lighting fixtures. Conceptual location...
The scope of the investment includes in particular: Construction of an outdoor pitch with a grass surface. Construction of sports infrastructure: grandstand, traps, fencing, lights for reserve players, pitch equipment, Hardening the area, Lighting the area, Construction 2 cloakroom buildings with a sanitary facility and internal installations, development of the area around the cloakroom buildings in the form of hardening the area, a pergola between the buildings, outdoor stairs, field planters, construction of connections and external installations, a hydrant, internal power lineA place intended for collecting waste,Ornamental and insulating herbs.Detailed description of the subject of the order according to the design documentation.The task is ready for implementation.The task will be implemented based on 2 decisions about building permit
1. Part I under the name: Reconstruction (modernization) of residential premises with the addresses: a) ul. Kalwaryjska 53/2 building permitb) ul. Kalwaryjska 53/6 building permit) ul. Kalwaryjska 63/I/11.2. Reconstruction (modernization) of the housing stock of the Piekary lskie commune w buildings administered by the Housing Management Company in Piekary lskie, consisting in performing general construction works on water, sewage and electrical installations in each apartment, in particular: dismantling the existing doors to the premises and interior doors, dismantling the existing equipment of the premises, dismantling the existing heat sources, replacing window frames, separating a sanitary room (bathroom), installing a new electrical, water and sewage installation, installing room heating devices, finishing layers of floors, walls and ceilings, installation of new entrance doors and interior doors, installation of bathroom and kitchen utensils, toilet bowl, shower, washbasin, sink, electric stove, electric heaters and hot water heater. In the apartments of parts Ia, b, part IIa, part III b,c,d, the works covered by the permit must be performed...
Zimmerarbeiten / Fenster / Gerüst
4.1.1. Part 1 of the order: purchase of hotel equipment and hotel clothing. Part 1 of the order includes: Bellboy jacket 1 pc., Hotel porter's jacket 1 pc., Double-breasted chef's blouse 1 pc., Stand-up dress 1 pc., Jacket luggage 1 pc. A detailed description of the subject of the order (OPZ) in the scope of part 1 of the order is included in Annexes No. 1/1 and 5/1 to the SWZ.
. development of design documentation along with obtaining the final building permit or notification. Design documentation should be prepared based on the attached Functional and Utility Program entitled: Development of design documentation and implementation of works construction for investments Protection of biological diversity in the Park and Palace Complex in Sieraków Śląski in the Ciasna Commune. together with annexes) constituting an annex to SWZ.1.2. execution of construction works related to the implementation of the task, including: the following construction works: - Removal of invasive species - Replacement of soil in places of new plant plantings. - Construction of park lighting. - Construction of park surfaces, pedestrian and bicycle paths. - Production and assembly of small architecture elements. - Planting plants. - Lawn arranging. - Creation of a teaching path from ecological education infrastructures. - Construction of monitoring.