TendersPedia
Search
Subscribe

construction-work Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 32523

This part of the order includes construction works consisting in changing the use of part of the school premises into a cradle in the building of the Educational Complex in Stoczek. The order includes the following: works: - changes in the use of the classroom located at ground floor of the building for a cubicle; - adaptation of the toilet adjacent to the above-mentioned room to the needs of small children; - renovation and reconstruction of the electrical installation to the extent necessary; - equipping a stair platform; - reconstruction of external stairs; - installation of a driveway for disabled; - delivery and installation of room equipment indicated in the design documentation. A detailed description and scope of the subject of the order is specified in the documentation constituting Annex No. 1A to the SWZ, which consists of: design documentation (development design plots, architectural and construction design, technical/executive design, construction design with information on health and safety, technical design (electrical industry), each and visualizations of the rooms, as well as, additionally, the bill of quantities for the work, which does not constitute a basis for determining the amount of remuneration in connection with the acceptance of a lump sum remuneration) and...

  • 05 Mar 2026
  • 135803505
  • Refer Document

1. The subject of the order is the performance of construction works related to the reconstruction of district road No. 1338L on the Lipniak - Zastawie section from km 3+273 to km 4+270. 2. The subject of the order includes the reconstruction of the road in the scope of construction of the strip and exits, including: - removal fertile land with removal of excess soil, - cutting down trees and bushes, - repairing damaged culvert elements, - making an embankment from unlined soil - unbound mixture with CBR20%, - setting concrete curbs with dimensions 15x30x100 cm with a 12 cm shelter and 15x22x100cm with 0cm light placed on a concrete bench with resistance, - setting concrete edges with dimensions. 8x30x100 cm on a concrete bench with resistance, - construction of the base of the band made of a mixture of aggregate bound with C3/4 cement - 15 cm, - construction of the foundation of the slopes concrete C 12/15 gr. 20 cm, - laying the surface with a strip of concrete paving stones, thickness. 6 cm on a cement-sand ballast thick. 4 cm, - laying the surface of the exits with concrete paving stones. 8 cm on a cement-sand ballast thick. 4 cm, - changes in organization traffic.3. A detailed description of the subject of the order is provided in: Design documentation along with the bill of quantities - Annex No. 9 to...

  • 02 Mar 2026
  • 135803498
  • Refer Document

The subject of the order is the construction of a section of the water supply network in ul. Sunny Morning in Jzefw, Nieport commune, according to the construction design prepared by Biuro Projektowo Inwestycyjne Zygmunt Lisowski. Construction notification no. WA.6743.594.2025.AR z on July 7, 2025, adopted by the Starost of Legionowo. The water supply network will be operated by GZK in Nieport. The scope of the study concerns the construction of a water supply network with a diameter of DN 160 mm on plots no. 93/1, 93/2, 93/13, 112, 147/2 rev. 0007 Jzefw. The investment includes the construction of a water supply network with a length of approx. 540 m, including outlets.

  • 04 Mar 2026
  • 135803493
  • Refer Document

1. The subject of the order is the development of design documentation by updating the design of the development of the area at the Gliwice Marina and the performance of construction works consisting in the development of the area at the Gliwice Marina in the area of ​​plots: 246601_1.0044.1/1, 246601_1.0044.1/4; orb Port; in Gliwice.2.The task is carried out in the design and build formula.3.The order includes landscaping in the field of leveling the area within hardened surfaces, construction of new surfaces paved pedestrian and bicycle paths, installation of selected elements of small architecture and external lighting. The detailed scope of the subject of the order is described in the Functional and Utility Program (FFU) constituting ANNEX No. 7 to the Specification of Order Conditions (SWZ).4.The documentation to be updated is ANNEX No. 12 to the SWZ.

  • 02 Mar 2026
  • 135803491
  • Refer Document

The subject of the order includes the construction of a sanitary sewage network, sanitary sewage connections within the road, sewage pumping stations, a rolling pipeline, power supply to the pumping station, reconstruction of the water supply network in Podmiejska Street in the town Kokoszkowy. The description of the subject of the order is the design documentation, including: construction and executive design, technical specification for the execution and acceptance of works, and bills of quantities constituting annexes to the SWZ. The ordering party notes that: - part of the construction works covered by the documentation has already been prepared, as presented in the graphic attachment (substantive scope), - the attached design documentation covers a wider scope of works than those covered by the proceedings in question.

  • 04 Mar 2026
  • 135803489
  • Refer Document

Construction of road lighting. In order to power the designed lighting poles, a YAKY4x25mm2 cable should be connected from the lighting pole no. I/7 (located on the road no. 45/33). The cable will power the designed lighting poles - the circumference length is 385 (445) m. The above-mentioned cable should be laid in road plots in accordance with the route marked in Fig. E2. At the intersection with dirt roads and underground utilities, the cable will be installed in a DVK 75 protective pipe. Before starting the work, please read the notes included in the arrangements. The lighting tower No. I/7 is powered from a lighting cabinet located on the road, plot no. 45/33, plot no. 45/30. The lighting cable line is powered from the existing 15/04 kV transformer station no. 06-0195 Dalki B, with a transformer power of 160 kVA. The route of the designed cable and the location of the designed supports are shown in Figure E2. Number of supports with fixtures: 10 pcs. Length of the cable line: approx. 445 m. Manual and mechanical earthworks. Details are included in PT+SST

  • 02 Mar 2026
  • 135803479
  • Refer Document

1. The subject of the order is the implementation of the first stage of expansion of the community center building with a garage in the town of Kamionka in the following scope: earthworks; bricklaying works; roof structure and roof covering; door and window joinery3. A detailed description of the subject of the order, including the scope of work necessary to complete the order and the Employer's requirements regarding technical parameters, are specified in: design documentation and bills of quantities constituting Annex No. 8 - OPZ to this SWZ and drafted significant provisions of the contract, Annex No. 7 to SWZ.4. The contractor must ensure that the works are performed in accordance with Polish law, in particular with technical and construction regulations, regulations regarding independent technical functions in construction and regulations regarding products and materials used in construction

  • 02 Mar 2026
  • 135803472
  • Refer Document

1. The subject of the order is the performance of construction works related to the construction of a multi-purpose sports field, construction of a farm building, demolition of a farm building and reconstruction of the gas network at the Primary School in Siedlanka, in accordance with the scope work resulting from the bill of quantities and documentation.2. Elements of the order: a) demolition works: farm building with a hardened yard and a fragment of the fence, b) construction of a multi-purpose sports field, earthworks, c) construction of a multi-purpose sports field with a surface polyurethane foundation footings, sub-bases, polyurethane surface, pickpockets, etc., d) multi-functional sports field, equipment (basketball, volleyball, handball, tennis), e) construction of a farm building with a steel structure, sheet metal casing, system on the square with a surface made of thick concrete cubes. 6 cm without chamfer, f) driveway to the farm building with a stone surface, g) sidewalks, field stairs, palisades made of concrete paving stones, thickness. 6 cm without phase, h) landscaping, herbs, baskets garbage, bicycle racks, benches, boards, i) internal electrical installations, j) external electrical installations, k) reconstruction of the network...

  • 02 Mar 2026
  • 135803463
  • Refer Document

Location for : Listing Title