The subject of the order includes construction works consisting in the reconstruction of district roads No. 1835L and No. 1840L by constructing a hardened external strip as part of the investment task called Reconstruction of district roads No. 1835L and No. 1840L. Scope The material order includes: 1. Measurement works on linear earthworks on a section of 3,056 km2. Preparatory and demolition works.3. Earthworks.4. Foundations.5. Hardened roadside surface.6. Hardening the area at the bus stop.7. Making a hardened outer band.8. Construction of a dirt roadside.9. Construction of exits 10. Finishing works.11. Construction of vertical and horizontal markings and BRD devices.12. As-built geodetic measurement.
- 02 Mar 2026
- 135803449
- Refer Document
