Construction works will be carried out on the basis of the decision to authorize the implementation of a road investment. Wielko/Range - construction of a link between ul. Ropczyck and ul. Tarnowsk (SECTION E-F) extension length: E-F in km 0+000 0+191.16 - construction of a 2.15 m wide sidewalk on the entire the length of the investment in question along the curb. - construction/reconstruction of individual and public exits - drainage, - lighting, reconstruction of the electrical network. The contractor will include in the offer the material benefits resulting from the transfer of demolition materials. Where in SWZ, standards, technical assessments, technical specifications and technical reference systems referred to in Art. 101 section 1 point 2 and section 3 of the Public Procurement Act, the Ordering Party allows offering solutions equivalent to those described, provided that they guarantee they will carry out the works in accordance with the issued decisions and will ensure that technical parameters are not worse than those assumed in the SWZ. If equivalent solutions are used, the contractor includes a list of equivalent solutions with their description or standards in the offer.
- 02 Mar 2026
- 135803328
- Refer Document
