TendersPedia
Search
Subscribe

construction-work Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 32531

1. The subject of the tender is the selection of a contractor who will perform construction works for the ordering party consisting in the reconstruction of the paved area with technical infrastructure on the premises of the Construction School Complex in Zakopane at ul. Krupwki 8 (at plots no. 113/3, 119/1 orb 5 Zakopane).2. The works that are the subject of the order consist in particular in the execution of: 1) Preparatory works; 2) Demolition of the mineral and bituminous surface and stairs; 3) Drainage, storm sewage, regulation of manholes;4) Sub-base, profiling and compaction of the base;5) Framing and edges;6) Cleaning and sprinkling of the sub-base;7) Hardened surface made of stone cubes;8) Surface made of bituminous mixtures;9) Slopes for disabled; 10) Lighting points recessed into the surface; 11) Modernization of the entrance stairs to the building and to the basement; 12) A grate securing the entrance to the basement; 13) External intercom; 14) Balustrades; 15) Earthworks; 16) A set of flower pots concrete;17) Cleaning works;18) Greenery facilities;in accordance with the design documentation, constitute Appendix No. 7 to SWZ, in accordance with the technical specification of...

  • 27 Feb 2026
  • 135803287
  • Refer Document

I. The subject of the order is the execution of an investment task called: Reconstruction, expansion and superstructure of the existing building of Primary School No. 1. Henryk Sienkiewicza at ul. Bartniaka 13a in Grodzisk Maz. STAGE II Task co-financed from funds Fund for the Development of Physical Culture, an investment task under the "Sports Poland - Program for the development of local sports infrastructure - 2024 Edition" as part of the implementation of the investment task "Construction of a gymnasium at Primary School No. 1 at ul. Bartniaka in Grodzisk Mazowiecki."2. Description of the basic scope of work: 2.1. The scope of the subject of the contract includes, among others: a) reconstruction, expansion and additions to the existing building of the Henryk Sienkiewicz Primary School No. 1 at ul. Bartniaka 13a in Grodzisk Mazowieckie in the scope of the second stage of the investment, including the construction of a gymnasium, b) purchase, delivery and installation of equipment for the school in question in the scope of the second stage of the investment, c) marking and securing the construction site for the duration of the works, d) all works in this part the rebuilt school and its immediate vicinity should be planned during times when there are no classes, e) surveying services, preparation of...

  • 02 Mar 2026
  • 135803280
  • Refer Document

Part No. 1. Modernization of the heat source.1.1. Scope of work: 1) Ground heat pump. Ground heat pump: nominal power 35 kW, brine/water type.2) Lower source. 8 vertical wells, 90 m each, total length 720 m, PE100-RC probe pipes 40 mm, double U, infill thermally conductive (silica bentonite), carrier: 30% propylene glycol solution, spacing between wells: approx. 8 m, in accordance with PZT, each well with shut-off and the possibility of flow balancing. 3) Distribution well. prefabricated PE, length 1200 mm, thickness 1.8 m, equipped with distributors and balancing valves. All work related to the lower source of the heat pump should be carried out in accordance with the guidelines of the manufacturer of the pipes used. The designed pipelines are run by, among others, 20-40 cm below the frost zone, the supply pipelines should be placed at a distance not less than 70-80 cm from each other and from other pipelines. In addition, special attention must be paid when filling the hole ring to ensure it is complete, without cavities and gas spaces. The filling will be made with a liquid filling mass. Pipe purpose casing: inserting and routing the supply lines for the brine circuit (a pair of supply and return pipes...

  • 02 Mar 2026
  • 135803266
  • Refer Document

Modernization of the Wgielnik area in Piwniczna-Zdrój as part of the investment project Modernization of tourist infrastructure in the City and Commune of Piwniczna-Zdrj.1. The subject of the order is the performance of construction works necessary for the planned completion contract for an investment task called Modernization of tourist infrastructure in the City and Commune of Piwniczna Zdrj under contract No. FEMP.07.05-I.00-0186/25-00-XXI/315/FE/25 of December 30, 2025. Name of the task: Modernization of the Wgielnik area in Piwniczna Zdrój. 2. As part of the works covered by the order, the following will be carried out: 1) renovation of the volleyball court consisting in the construction of a new natural grass surface and replacement of sports equipment, 2) construction of a fence in the form of pickguards, 3) construction fences for the playground, 4) construction of small architectural objects in public places, 5) renovation of outdoor stairs, 6) hardening of the area, construction of a safe surface under the playground and fitness equipment. Note! The detailed scope and number of works are determined by Design documentation. It is the Contractor's responsibility to inspect the investment site in order to reliably calculate...

  • 02 Mar 2026
  • 135803265
  • Refer Document

1. The subject of the order is the modernization of the third floor of the building of the Greater Poland Voivodeship Office in Poznań at ul. Winiowa 13a, adapting the facility to the needs of the Medical Dispatch Office, implementation of the first part of the project, including the execution of works construction, structural changes in the facility, replacement and retrofitting of rooms with necessary technical installations, in particular water and sewage, electrical and central heating installations.2. Detailed scope of construction works and the method of their implementation was specified: in the description of the subject of the order, design documentation (implementation of the first part of the project), bills of quantities, technical specifications for the execution and acceptance of works, which constitute Annex No. 4 to the SWZ. 3. Work not included in the bill of quantities, but necessary execution of the subject of the order, the Contractor is obliged to include the order price in the offered price.

  • 03 Mar 2026
  • 135803253
  • Refer Document

Location for : Listing Title