4.2. The subject of the order is the reconstruction of ul. Wadysawa Warneczyka in Wierklany Stage II (from km 0+245.16 to km 0+591.48)4.3. As part of the planned investment, it is planned to: 4.3.1. Reconstruction of the road - road width 4.5 m, 4.3.2. Construction of a double-sided roadside hardened with fattening, 0.75 m wide, 4.3.3. Construction of a storm sewage system, rainwater and snowmelt water from the reconstructed road section will be directed to the W2 outlet, 4.3.4. Construction of a typical prefabricated reinforced concrete wall retaining structure. The structure of the base and surface is as follows: - wearing course of asphalt grit concrete, grade I AC11S, 5 cm thick, - base layer of grit asphalt concrete, grade I AC16W, 6 cm thick, - main subbase of concrete asphalt AC22P stage II, 7 cm thick, - a layer of base base made of a mixture unbound with C90/3 aggregate, fraction 0-31.5 mm, 25.0 cm thick, - a layer of improved base made of ash-beam mixture BP-5, 25.0 cm thick.4.4. Detailed description of the item the order is presented in the annexes to this ToR: 4.4.1. design documentation,4.4.2. technical specification for the execution and acceptance of works, ...
-
26 Feb 2026
-
135622224
-
Refer Document