TendersPedia
Search
Subscribe

construction-work Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 31966

Task 1 includes work consisting in the design and implementation of construction works to improve energy efficiency: a) Commune Office Building in Turek, ul. Ogrodowa 4, 62-700 Turek,b) Building of the School and Kindergarten Complex in Sodków, Sodkw 21, 62-700 Turek,c) Primary School Building in Sodków, Sodkw 21, 62-700 Turek

  • 26 Feb 2026
  • 135622371
  • Refer Document

approx. 4.4 t canopy lying right of way (steel construction) approx. 90 m² trapezoidal profiled sandwich element (roof covering) approx. 0.3 t canopy staircase ZNA (steel construction) approx. 12 m² trapezoidal sheet metal (roof covering) 1 piece. Grating cover for lifting system 1 piece. Ventilation/weather protection grille approx. 20 m parapet railing Metalworking (CPV code: 45262670)

  • 20 Mar 2026
  • 135622370
  • Refer Document

The subject of the order is: The subject of the contract is the preparation of design documentation and the comprehensive renovation of the viaduct over the CMK railway line along with land development. As part of the subject of the order, comprehensive design work should be performed along with obtaining the necessary decisions, maps for design purposes, opinions and permits, and perform a comprehensive renovation of the viaduct in the design and build system for the Task. During design and construction works, the Functional and Utility Program should be taken into account Decision of the Witokrzyskie Provincial Construction Supervision Inspector. Renovation of the viaduct over the CMK railway line along with access roads along the district road No. 1497 T Fakw Rudzisko at km 1+770.

  • 27 Feb 2026
  • 135622367
  • Refer Document

1. The subject of the order is construction works: Partial renovation of municipal roads.1) The scope of the subject of the order includes: a) Renovation of surfaces with crushed aggregate; b) Renovation of bumpy surfaces of municipal roads with crushed aggregate; c) Partial renovation of bituminous surfaces hot mineral-asphalt mixture;d) Renovation of drainage devices: - culverts, - linear drainage, - desilting of ditches, - earth removal;e) Renovation of the sidewalk;f) Renovation of roadsides;g) Excavator services for renovation works;2) The order includes: a) Execution and handing over the subject of the order, completed in accordance with the cost estimate, principles of technical knowledge and construction skills; b) Other elements included in the offer price constituting the subject of the order: performance of necessary tests, tests, measurements, security, inspection and acceptance technical facilities together with fees, determining the location, providing and maintaining the necessary technical facilities and material storage area, tidying up the area after the works are completed, maintaining the passability of the road and access to the property during the implementation period robot.2. The description of the subject of the order includes: a) design documentation, i.e.: - documents enabling a clear determination of...

  • 02 Mar 2026
  • 135622343
  • PLN 933552.00

The subject of the order is the execution of construction works consisting in the construction of a sports track and a long jump hill. The designed track and jump track will be located between two sports fields. Bienia will be built on the same level as the existing one pitches. After the investment is completed, the lawns around the track will be rebuilt. A three-lane track for 60 m runs is planned, along with a long jump hill. The running surface must be even and horizontal. The greatest permissible transverse slope should not be exceeds 1%. Number of tracks 3, each track 120 cm wide. All tracks should be the same width. Lines separating individual tracks, 5 cm wide, white. Only the lines on the right side of each track should be included in the width of each track. Benia simple way to run 60 m races with the necessary accessories for starting blocks and braking. Sprayed polyurethane surface. The planned hill consists of a runway that will be shared with the track, a take-off area (threshold) and a landing pad. Reflection beam it should be planted even with the level of the divergence, length 122 cm, width 34 cm. The landing pad is a sand-rimmed hill...

  • 26 Feb 2026
  • 135622342
  • Refer Document

4.2. The subject of the order is the reconstruction of ul. Wadysawa Warneczyka in Wierklany Stage II (from km 0+245.16 to km 0+591.48)4.3. As part of the planned investment, it is planned to: 4.3.1. Reconstruction of the road - road width 4.5 m, 4.3.2. Construction of a double-sided roadside hardened with fattening, 0.75 m wide, 4.3.3. Construction of a storm sewage system, rainwater and snowmelt water from the reconstructed road section will be directed to the W2 outlet, 4.3.4. Construction of a typical prefabricated reinforced concrete wall retaining structure. The structure of the base and surface is as follows: - wearing course of asphalt grit concrete, grade I AC11S, 5 cm thick, - base layer of grit asphalt concrete, grade I AC16W, 6 cm thick, - main subbase of concrete asphalt AC22P stage II, 7 cm thick, - a layer of base base made of a mixture unbound with C90/3 aggregate, fraction 0-31.5 mm, 25.0 cm thick, - a layer of improved base made of ash-beam mixture BP-5, 25.0 cm thick.4.4. Detailed description of the item the order is presented in the annexes to this ToR: 4.4.1. design documentation,4.4.2. technical specification for the execution and acceptance of works, ...

  • 26 Feb 2026
  • 135622224
  • Refer Document

1. The subject of the order is to change the use of the former banquet hall into residential premises at ul. Wojska Polskiego 14 in cinawka mednia1.1. The scope of work includes: 1) disassembly of windows and doors, 2) demolition of bricked-up wall fragments in places of the old window and door joinery in accordance with the graphic part of the study, a section of the wall for making new window openings in accordance with part of the drawings of the study, 3) The demolition of the floor due to the existing damage from the layers of circumstantial evidence is planned lowering the floor and installing new floor layers.1.2. Renovation works: 1) construction of new walls from plasterboards and plasterboards in accordance with the graphic part of the study, 2) construction of acoustic panels made of mineral wool between the premises, 3) insertion of new external doors to the premises,4) construction of new internal doors to the designed rooms,5) connection to existing ventilation chimneys/construction of new ventilation chimneys,6) construction of water and sewage installations,7) construction of electrical installations,8) installation of heating, 9) installation of new floors, 10) installation of a new mezzanine ceiling, 11) installation of balustrades for protection...

  • 26 Feb 2026
  • 135622207
  • Refer Document

Part I Delivery and installation of YOMB road slabs, delivery and installation of solid road slabs. Part I includes: 1) Delivery and installation of YOMB road slabs (open-wall, dimensions: 1.00 m x 0.75 m x 12 cm): a) new YOMB slabs, b) resurfacing without the need to delivery of YOMB slabs, c) YOMB slabs recovered from the Contractor's material. Scope of work: Incorporation of the material (replacement/relocation) on a sand bed with a thickness of 12 cm. The item includes all costs related to measuring and preparatory works, demolition of the road together with the existing substructure, removal of materials, disposal of waste or deposit of materials (or their parts) in the place indicated by the Investor (if the demolition material is suitable for re-installation), delivery of materials to the place of installation, construction of the bed, construction of sub-base and ballast, filling the joints of the surface with 01 mm sand, removal and disposal of demolition waste. 2) Delivery and installation of solid road slabs (thickness: 15 cm): a) new slabs, b) re-laying the surface without the need to delivery of boards, c) boards made from recycled materials by the Contractor. Scope of work: Installation of material (replacement/relocation) on the base...

  • 26 Feb 2026
  • 135622206
  • Refer Document

Location for : Listing Title