1. The subject of the order is the construction of a storm sewage system (gravity and rolling) along with the construction of a tight retention reservoir, stormwater pumping stations and purification devices. The beginning of the scope of works begins with well St205/5 located on the DR205 road (km 1+234) and ends at the W outlet with a non-return valve to the Dopyw stream in Ksiu Wielki, located on plot no. 237, district 0005, Czstoszowice. The route of the stormwater drainage network being built is shown in the graphic attachment and the PZT, included in Annex 8 to OPZ. 2. The stormwater drainage system will be used to capture rainwater and meltwater flowing from the road communication system under construction and the area of the Technology Park and the expanded section of the district road (DP1241K- in accordance with project D301).3. The scope of work includes in particular: - preparatory works, - earthworks, - assembly works, - construction of a retention reservoir; - construction of a storm sewage system, - stormwater pumping stations; - tidying up the area.4. Construction works will be implemented on the basis of the final Decision of the Starosta of Miechów of November 27, 2025. mark: BA.6740.264.2025.JS with permission...
-
02 Mar 2026
-
135803322
-
PLN 2032520.33