Order type: Construction 45233000 - Construction work, foundation work and superstructure work for long-distance roads and roads Document reference number: 351-0008/2026
- 27 Feb 2026
- 135634656
- Refer Document
Subscribe
Order type: Construction 45233000 - Construction work, foundation work and superstructure work for long-distance roads and roads Document reference number: 351-0008/2026
Order type: Construction 45223800 - Assembly and installation of prefabricated structures Document reference number: JN-01/2026
BTG - renovation and expansion on the B. Traven Community School campus HOWOGE Wohnungsbaugesellschaft mbH (hereinafter HOWOGE) is planning the renovation and renovation of the 23,640 m² building plot at Recklinghauser Weg 26 in the Berlin-Spandau district Expansion of the B. Traven Community School. The services to be awarded relate to general contractor services for the turnkey construction of an alternative accommodation in modular container construction, during ongoing school operations School operations. General contractor services Interim school container system in modular construction for the alternative quarters at the BTG location The services to be awarded relate to the turnkey construction of an alternative accommodation including planning services a general contractor (GÜ-Interim). The service includes all structural and technical construction work required for the complete construction, maintenance and dismantling of a school container system using system construction. This includes the Implementation planning, in particular a (type) statics to be checked by building authorities, the work and assembly planning, as well as all other planning, deliveries and services that are necessary to ensure that a school container system is on time, functional and to be built without defects. As things currently stand, the service life of the alternative accommodation should not exceed two years. Further information on the scope of the project and the service content can be found in a project profile...
The subject of the order is a service consisting in comprehensive year-round (current and winter) maintenance of national roads managed by the General Directorate for National Roads and Motorways, Branch in Poznań, including the maintenance of national roads in the District. in Kalisz The service includes year-round work, including winter and ongoing road maintenance, in particular: - road surface maintenance, - maintenance of roadsides and medians, - maintenance of the road body, - maintaining dehydration, - maintenance sidewalks and bicycle paths, - maintaining signage, - maintenance of traffic safety devices - maintaining the aesthetics of signs, traffic safety elements and the road, - maintenance of assistive devices, - winter road maintenance - contract management - maintaining cleanliness in engineering facilities, - auxiliary works The scope and method of performing the service are specified in the documents: - essential terms of the contract - description of the subject of the order (OPZ), Year-round comprehensive (current and winter) maintenance of national roads in the Poznań Branch - Kalisz District in 2026-2030. The subject of the order is a service consisting in comprehensive year-round (current and winter) maintenance of national roads managed by the General Directorate for Roads National and Motorways Branch in Poznań, covering the maintenance of national roads in the Kalisz region The service includes year-round work, including winter and ongoing road maintenance, in particular: - keep...
The subject of the framework agreements are construction services in accordance with the respective service call for the fire protection upgrade of the Rastatt Clinic ("contractual object"). The subject of the order, in particular the content and scope of the The services advertised and to be offered can be found in detail in the tender documents, in particular in the overview of the order basis (AÜ - Document No. 10). Ventilation (L) and heating, plumbing (HS) for fire protection renovation of the clinic Rastatt Subject of the contract: The fire protection renovation is based on planning services taking into account the current fire protection concept from June 9, 2019. The construction work was carried out via framework agreements so that a cluster-by-cluster (section-by-section) Execution is possible to protect the clinic operations as much as possible. A total of 8 framework agreements will be advertised for the different trades. The total measure (cost groups 300 and 400) is based on a preliminary cost forecast to EUR 33,000,000 net. The framework agreements should each be concluded with three to five contractors and have a term of nine years. The bidders who qualify as framework agreement partners will be granted assistance within the framework of the individual projects given the opportunity to repeatedly apply the content of their offer from the award procedure in question. A mini-competition or the cascade procedure is used to award the individual measures...
Metal construction work windows, doors, gates at the Sulzbach II pumping station: Manufacture and assembly of the following elements: -Windows and doors, a total of 9 window elements and 4 doors -Working windows, gates and doors on the inside and outside -ventilation elements and Weather protection slats -Flap for emergency power supply -Folding sliding door shell dimensions 4x4.2m with previous builder; Technical processing: -Planning services, documentation Sulz.3072 - Metal construction SW Sulzbach II Metal construction work windows, doors, gates at the pumping station Sulzbach II: Manufacture and assembly of the following elements: -Windows and doors, a total of 9 window elements and 4 doors -Working windows, gates and doors on the inside and outside -Ventilation elements and weather protection slats -Flap for Emergency power feed-in -Folding sliding door shell dimensions 4x4.2m with previous builder; Technical processing: -Planning services, documentation Doc Title: Sulz.3072 - Metallbau SW Sulzbach II Contract Type: works
SECTION II - BASIC INFORMATION 2.1.) The announcement concerns: Public procurement 2.2.) The announcement concerns social services and other specific services: No 2.3.) Name of the order or framework agreement: Road modernization - hardening of roads with aggregate. 2.4.) Case ID: ocds-148610-ba5d72b1-cce3-410c-8c36-842303477786 2.5.) Advertisement number: 2026/BZP 00107439 2.6.) Announcement version: 01 2.7.) Date of announcement: 2026-02-11 2.8.) The order or framework agreement was included in the procedure plan: No 2.11.) Only contractors referred to in Art. 94 of the Act: No 2.14.) Does the order or framework agreement concern a project or program co-financed by the European Union: No 2.16.) Grant procedure orders along with the legal basis The order is awarded in the basic mode on the basis of: Art. 275 point 2 of the Act
Construction of a laboratory building at the IKFT Institute, here: partial service for indoor air technology Building 219 New building IKFT - air conditioning technology Implementation of air conditioning installations, scope of services in accordance with LV and as follows: - 4 RLT devices laboratory bars with 2 KVS systems - 2 RLT devices laboratory technical center with 1 KVS system - 3 RLT devices general ventilation - 4 RLT devices 24h exhaust air - ventilation duct: - approx. 1600 m PPs round - approx. 2500 m2 PPs square - approx. 1400 m galvanized steel round - approx. 3800 m2 galvanized steel square - approx. 290 pieces. Volume flow controller (excl. laboratory ventilation) - approx. 250 pieces. Fire protection flaps - approx. 23 pieces. Smoke extraction dampers Doc Title: Building 219 New building IKFT - air conditioning technology Contract Type: works
Innkjøpsservice Advokatfirma AS is carrying out the procurement on assignments for Fauske municipality. See the tender documentation and annexes for further information.
Doc Title: Project Manager - Fauske municipality
Contract Type: services
The extension of SWU Verkehr GmbH's tram vehicles by 11 meters is planned various operational facilities at the SWU depot, which are responsible for the maintenance and upkeep of the Vehicles are necessary, structural modifications are required, thus the function of this Facilities can also be met for extended vehicles. The individual measures concern Hall C with storage areas, company workshop with work stands and washing hall, the central workshop in the hall E, as well as the adaptation of the tracks in the outside area Hall E The overall construction project is divided into four sub-construction sites in terms of location and timing: Reconstruction of Hall E (central workshop) - Section 1: Extension of Hall E on the west side with approx. 15 x 24 m Extension of roof work stands E2 by approx. 12 m Extension of lifting area E3 and E4 by approx. 12 m Direct track connection between Hall C and Hall E Reconstruction of Hall C (storage hall) - Section 2: Installation of siding C3-C5 Installation of a pit Relocation of the underfloor wheel set lathe (UFD) C10, approx. 6.50 x 13.00 m Implementation of an electronic validation system for wheels/wheel set measuring system (EVA) C11 Installation of a C9/C10 partition wall with approx. 120 m and a gate system Installation of a vehicle scale C11 Reconstruction of Hall C (company workshop) - Section 3: Extension of working stands C12 and C13 by approx. 12 m Adjustment of switches to maintain the through track C14-C16 Reconstruction of Hall C (washing hall) - Section 4: ...