The subject of the order is the design and expansion of a water treatment plant in Pieki and the expansion of the municipal water supply and sewage collection system. Installation of technological devices and pipelines in a building on the premises of the Water Treatment Plant: construction and assembly aeration system, execution and installation of a filtration system for iron and manganese removal - protection of the quality of drinking water, assembly of a set for rinsing filters with air and water, air drying, UV disinfection devices, execution and assembly of a second stage pumping station execution of the PIEKI-KRZYWDAR water supply connection electrical works and instrumentation: construction of the main power and control switchgear adapted to work with a power generator, execution of power supply installations for technological devices, execution of installations control and signaling, instrumentation and control, overvoltage and lightning protection, fabrication and installation of devices related to monitoring and data transmission, assembly/construction of accompanying facilities: assembly of a steel technological container, assembly of 1 steel water retention tank clean construction of a drainage clarifier with water management for the plot/drainage construction of external and internal pipelines...
-
02 Mar 2026
-
135803115
-
Refer Document