Construction of school space and school hall with decoration of outdoor space - Dugo Selo Primary School
- 17 Feb 2026
- 135654518
- HRK 14548923.11
Subscribe
Construction of school space and school hall with decoration of outdoor space - Dugo Selo Primary School
PROJECTS OF ARRANGEMENT OF SAPPHUS STREAM
(2026-ESO-96) 110/10 kV Nemenčinė TP works, Vilnius district. weekly Nemenčinė, Bažnyčios st. 25 and 110/35/10 KV Jašiūnai TP works, Šalčininkų district. week, Jašiūnai, Paperinės st. 5A, in the part of the distribution network d... (2026-ESO-96) 110/10 kV Nemenčinė TP works, Vilnius r. weekly Nemenčinė, Bažnyčios st. 25 and 110/35/10 KV Jašiūnai TP works, Šalčininkų district. week, Jašiūnai, Paperinės st. 5A, in the part of the distribution network due to the reconstruction of LITGRID AB
Renovation of the auxiliary football field in Bačevac (Poljičanin) Srinjina
Kier Transportation require a Subcontractor to undertake the Central Reserve Retaining Wall - Castle Howe Structures works at Lune Gorge.
This is for an Earth Retaining structure to be installed in the Central Reserve immediately behind the existing bridge abutments to retain the adjacent Motorway carriageway during abutment replacement works.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Kier Transportation require a Subcontractor to undertake the Central Reserve Retaining Wall - Tebay, Jeffery's & Borrowbeck Structures at Lune Gorge .
This package requires a Combi- Wall (Tubular/ Sheet piles) box structure to be installed in the Central Reserve immediately behind the existing bridge abutments to retain the adjacent Motorway carriageway during abutment replacement works.
Potential to be procured as a package as multiple trades are required
(General Civils/ Piling/ Coring/ FRC/ Steelwork etc) to complete.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
It is planned to purchase the sealing works of the deformation and technological joints of the P4 multi-storey parking lot of the Vilnius airport
Central Swindon North Parish Council invites tenders for a heat decarbonisation programme across four community centres:
• Even Swindon Community Centre, SN2 2BG
• Des Moffatt Western Community Centre, SN2 1NF
• Gorse Hill Community Centre, SN2 8DA
• John Moulton Hall Community Centre, SN2 5DU
The works include design development from RIBA Stage 3 to Stage 4, decommissioning and removal of existing fossil fuel heating plant, installation of ASHP systems including associated pipework and emitters where required, electrical capacity checks and liaison with the DNO as required, installation/commissioning of BEMS, seasonal commissioning, training, and full handover documentation.
This procurement is being conducted as an Open Procedure. Due to PSDS funding constraints the programme is time critical.
2026-0087 Road construction work on Friedrich-Ebert-Straße (fire station LZ610) in Duisburg-Rheinhausen