TendersPedia
Search
Subscribe

industrial-machinery Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 6712

1. The subject of the order is the execution of construction works consisting in the reconstruction and superstructure together with the thermal modernization of the common room building in Powiardwka together with the necessary technical infrastructure, the construction of a wastewater tank and the demolition of the building. economic, as well as the removal of a collision: a fragment of the overhead line between the pole stand no. 12 to no. 13 in msc. Powiardwka.2. The scope of the order includes in particular: 1) removal of interference: a fragment of the overhead line between the station supra from 12 to 13 in the month. Powiardwka, 2) demolition of the farm building, 3) reconstruction and superstructure of the building along with demolition works, 4) performance of thermal modernization works in accordance with the energy audit and project documentation, including: - insulation external partitions, - replacement of external windows, - replacement of door joinery, - modernization of the hot water heating system and central heating: construction of a new heat source, heat pump with underfloor heating, installation of an air-conditioning and ventilation system with recovery, - construction of renewable energy micro-installations - photovoltaic panels with a capacity of 14 kWp, - replacement of lighting fixtures with LEDs, - execution of other...

  • 26 Feb 2026
  • 135622507
  • Refer Document

Purchase of equipment for adapting and equipping facilities (shelters) for civil defense purposes in Alūksne, in accordance with the Technical Specification (Appendix 1). Safety features Electrical goods Inventory Generators and additional equipment Mobile trailer for the power generator and additional equipment Communications Communication satellite system Protective shield Doc Title: Purchase of equipment for adapting and equipping facilities (shelters) for civil defense purposes in Alūksne Contract Type: supplies

  • 18 Mar 2026
  • 135622496
  • Refer Document

Delivery, assembly, commissioning, trial operation and final acceptance of 2 tandem underground wheel lathes (URD) for the Friedrichsfelde and Britz-Süd workshops For the Berlin subway, the Britz-Süd and Friedrichsfelde locations are to be used an identical CNC-controlled tandem underfloor wheelset lathe must be procured. The subject of the award is production, delivery, assembly, commissioning, training, trial operation and final acceptance of the machines, including all functionally necessary ones Ancillary systems and peripheral systems. The machines are to be designed for measuring and processing wheel sets of the Berlin subway in standard gauge (1,435 mm) in accordance with the Technical Rules for Track Guidance (TRSp, operating system "E"). You especially need the Enable processing of different wheel set configurations when installed, in bogies and as individual wheelsets and ensure automatic measurement, reprofiling and compliant documentation of the processing. For the The scope of services also includes: - suitable measurement and documentation systems including electronic logging, - required suction, disposal and hydraulic systems, - Interfaces for data transmission and remote maintenance, - CE compliant Execution according to the state of the art. The primary measuring circle diameter range to be processed is between 350 mm and 900 mm; the maximum axle load is approx. 180 kN. Details can be found in the contracts...

  • 13 Mar 2026
  • 135621756
  • Refer Document

1. Description of the subject of the order: Preschool education infrastructure, construction of a kindergarten in Mazewo. Execution of design documentation and construction works in the design and build formula in accordance with the Functional and Utility Program, hereinafter referred to as the PFU, constituting Appendix No. 9 to SWZ and consisting in the preparation of design documentation (design, obtaining legally required decisions and construction permits) and implementation of construction works. As part of this order, all possible studies must be prepared turned out to be necessary for the design, construction and use of the subject of the order. All studies should be prepared in a number of copies enabling obtaining all necessary agreements and permits, plus always 2 copies for the Ordering Party. a) Design documentation. The documentation part should: - develop (if required) an assessment of the investment's impact on the environment; - develop situational and height maps for design purposes; - develop architectural and construction designs in all necessary industries with all required arrangements, including network operators with whom the investment...

  • 06 Mar 2026
  • 135621637
  • Refer Document

The subject of the order is the expansion and modernization of the existing technological line for glass recycling in order to increase its efficiency and expand technological possibilities in terms of sorting glass fractions with a grain size of 3 mm to 10 mm. Item the order includes in particular the design, delivery, assembly and commissioning of elements of the new technological line, along with its full integration with the functioning installation of the Ordering Party. An important element of the scope of the order is to ensure compatibility and connection of the existing technological line with newly designed or expanded elements in the field of automation, control and security systems. The scope of the order will also include the integration of other systems (common for both parts of the investment), including among others dust extraction installation or compressed air system, in a way that ensures the proper functioning of the entire technological line, compliance with applicable technical, environmental and occupational safety requirements, as well as achievement of the assumed parameters technological installations. After completing the subject of the order, the entire technological line, both in part...

  • 26 Feb 2026
  • 135621597
  • Refer Document

1. Construction of the chilled water installation1.1. Connecting the chilled water distributor1.1.1. The new distributor in building D should be installed and connected to the designed chilled water source1.2. Installation of the chilled water distribution system on the technical floor 1.3. Mont chilled water risers1.4. Installation of the chilled water distribution system in the suspended ceilings of the high ground floor in building D Pitra 1.4.1. Chilled water system pipes1.4.2. Connecting fan coil units to the installation2. Purchase and installation of fan coil units (factory new)2.1. Assembly of units2.2. Installation of the power supply system for indoor fan coil units on the high ground floor in building D, 2.3. Construction of a power supply system for circulation pumps on the technical floor, 2.3.1. Construction of a switchboard for circulation pumps and fan coil units,2.3.2. Carrying out measurements of the design of electrical installations. The ordering party requires brand new equipment and parts.

  • 26 Feb 2026
  • 135621586
  • Refer Document

Location for : Listing Title