TendersPedia
Search
Subscribe

oil-and-gas Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 128

Ålesund municipality and Sula municipality cooperate through the project "BLÅ - fjords for the future", to construct a new sewage treatment plant at Kongshaugen (Kvasnes) in Sula municipality. The aims in the project are as follows: Cleaner fjord systemLovlig system for sewage waterBærekraftig system for the futureIt new sewage treatment facility shall be built in rock and have sufficient treatment capacity to handle sewage water that shall be supplied from Sula municipality and Ålesund municipality. The facility is dimensioned for 69,000 person equivalents and it shall be designed as a secondary treatment facility. The new treatment facility shall replace seven existing treatment plants and some interceptors for sludge. The sewage water must therefore be pumped from the existing treatment plant to Kongshaugen via a comprehensive transfer system. The transfer facility will have approx. 34 km sewage pipelines and will contain 25 objects, including approx. 28 km submarine pipelines, 6 km pipelines over land, 3 valve houses/manholes and nine pump stations. The contract work for the construction of the transfer facility will be organised as nine parallel execution contracts. For a more detailed description of the other contracts see Part A - General part. The builder shall now enter into a contract with one contractor for the delivery of machinery and process 3 for the transfer facility (contract E64), as a part of the transfer facility to Kongshaugen reindeer installations. The ...

  • 25 Feb 2026
  • 134455616
  • Refer Document

The Offshore Observer Programme is a cornerstone of the UK's approach to sustainable fisheries management. It provides independent, high-quality data that underpins stock assessments, advice, and compliance with national and international obligations, including the Fisheries Act 2020. By placing trained observers on commercial fishing vessels, the programme ensures accurate information on catch composition, discards, and biological characteristics is collected during normal fishing operations. To meet the requirements of the Fisheries Act 2020, Cefas contributes to the data collection and collation requirements laid out in the UK Data Collection Framework (DCF). The UK DCF ensures consistent and continuous fisheries data collection across each UK administration, enabling them to establish multiannual programmes for the collection and management of these data. In England, Cefas is responsible, for the most part, for the collection of fisheries-dependent data, which includes deploying Offshore Observers on commercial fishing vessels to sample catches of shellfish, demersal and pelagic fish stocks, and associated bycatch. Access to vessels is negotiated on a voluntary basis, as there is no mandatory requirement for vessels to carry observers. Maintaining strong industry relationships and professional conduct is therefore essential to secure ongoing cooperation. Each year, Cefas determines the number of sampling trips required to meet DCF obligations and allocates resources accor...

  • 27 Feb 2026
  • 134433872
  • Refer Document

Provision of ROV Training
4. Scope of RequirementUHI NWH intends to procure a supplier to design and deliver a range of ROV courses that meet the current and emerging needs of industry. The provider will be expected to deliver:- Courses fully compliant with relevant IMCA training requirements.- A comprehensive curriculum covering all core aspects of ROV operations, including system fundamentals, electronics, hydraulics, fiber optics, mechanical systems, fault‑finding, troubleshooting, operational procedures, safety, launch and recovery, documentation, and reporting.- Delivery of both theoretical and practical training, incorporating simulator and realistic operational environments.- Hands‑on opportunities to build operational competencies.5. Student Preparation & Industry EngagementThe selected provider will support learners with career readiness, employability skills, industry expectations, and pathways. Providers must have strong industry links enabling employer engagement, guest sessions, and connections for trainee placement or recruitment.6. Supplier RequirementsInterested providers should demonstrate:- Minimum 10-year proven experience delivering ROV and subsea training to recognised industry standards.- IMCA‑aligned course delivery.- Access to competent instructors and where appropriate, ROV equipment and simulators - Strong and current industry partnerships.- Ability to deliver career‑focused, learner‑centred training.
Reference number : CS-NWH-41096

  • 26 Jan 2027
  • 134432805
  • Refer Document

THIS TENDER HAS BEEN ISSUED FOR THE PROCUREMENT OF 8 INCH PIPES FOR THE REPLACEMENT OF SEALINE NO 19 PROJECT THE EXISTING PIPELINE HAS SURPASSED ITS DESIGN LIFE AND IS AT RISK OF LEAKAGES FAILURE DUE TO CONTAMINATION THE REPLACEMENT NEW PIPELINE WILL PROVIDE MORE RELIABILITY IN TRANSPORTING THE PETROLEUM PRODUCTS THROUGH EXPORT FACILITIES UNDERSCORING THE IMPORTANCE OF ENSURING BUSINESS CONTINUITY, 76000000-3 - Services related to the oil and gas industry

  • 25 Feb 2026
  • 134421379
  • BHD Refer Document

The contract period is 2 years with an option for 1+1 year extension. The estimated value is NOK 3 million (excluding VAT). Scope of the procurement: Pipe inspection, flushing, sludge suction and reporting in accordance with. Norwegian Water Report A234 (2018) Acute and planned assignments including Documentation in Gemini Va. or equivalent.
Doc Title: Framework agreement for pipe inspections and flushing.
Contract Type: services

  • 27 Feb 2026
  • 134411607
  • NOK 50000000.00

The framework agreement includes washing truck and sludge suction services, root cutting, as well as TV inspection of spills, stormwater pipes and wells. The framework agreement covers the following tender areas: •Gable •Hofors - Ockelbo •Elvkarleby •East Hammar Framework agreement Washing machine services and TV inspections The framework agreement includes washing truck and sludge suction services, root cutting, as well as TV inspection of spills, stormwater pipes and wells. The framework agreement covers the following tender areas: •Gable •Hofors - Ockelbo •Elvkarleby •East Hammar Doc Title: Framework agreement Car wash services and TV inspections Contract Type: services

  • 25 Feb 2026
  • 134411528
  • SEK 1

T_52491 - Alternative natural gas supply service transported via cylinder wagons and/or tank vehicles Lot 1/Emilia Romagna Area - Alternative natural gas supply service transported via cylinder wagons and/or tank vehicles Lot 1 - ALTERNATIVE SERVICE OF SUPPLY OF NATURAL GAS TRANSPORTED VIA CYLINDER TRUCKS AND/OR TANK VEHICLES Lot 2/Liguria Area - Alternative natural gas supply service transported via cylinder wagons and/or tank vehicles Lot 2 - SERVICE ALTERNATIVE FOR THE SUPPLY OF NATURAL GAS TRANSPORTED VIA CYLINDER TRUCKS AND/OR TANK VEHICLES Lot 3/Piedmont Area - Alternative natural gas supply service transported via cylinder wagons and/or tank vehicles Lot 3 - ALTERNATIVE SERVICE FOR THE SUPPLY OF NATURAL GAS TRANSPORTED VIA CYLINDER TRUCKS AND/OR TANK VEHICLES Doc Title: Alternative natural gas supply service transported via cylinder wagons and/or tank vehicles Lot 1/Emilia-Romagna Area Lot 2/Liguria Area Lot 3/Area Piemonte Contract Type: services

  • 09 Mar 2026
  • 134409135
  • EUR 226947.06

Drilling exploration and measurement in 4 locations (Březový potok, Hrádek, Horka and Janoch), which will be divided into three sub-parts, for which it will be possible to submit a separate offer: 1. Implementation of core drilling works, i.e. 4 core boreholes with a depth of approx. 600 m, including preparatory work for the implementation of wells, including resolving conflicts of interest for well sites and access roads, final work on well sites and handover of land, communication support of SÚRAO, data management of primary data and their interpretation. In case of occurrence unstable sections of wells that will need to be stabilized, for example by injection, will also include basic hydrodynamic tests. Groundwater samples will be taken from these sections in case of sufficient inflow. There will be water on the samples taken laboratory and chemical analyzes were carried out, including selected trace elements, radioactivity indicators, dating of the age and origin of waters and the contents of dissolved gases. An integral part of this performance will also be the preparation of the final report for the drilling work of which it is a part there will also be an evaluation of hydrogeological works. 2. Implementation and interpretation of complex logging measurements for the above 4 implemented core wells + data management and data interpretation. 3. Conducting geomechanical tests for the above-mentioned 4 realized cores wells in order to obtain the total stress tensor. Borehole survey and measurements in the wells of the locations Březový potok, Horka, Hrádek and Janoch - REPEAT Borehole exploration and measurement in 4 locations (Březový potok, Hrádek, Horka and Jan...

  • 09 Mar 2026
  • 134218816
  • Refer Document

Elering AS (hereafter ELR) procures the service of drilling and closing the natural gas transmission pipeline along with the supply of the necessary materials. / Grounds for elimination and qualification conditions: See the basic procurement documents Drilling and sealing pipelines under pressure solution Doc Title: Pipeline pressure drilling and capping solution Contract Type: services

  • 13 Feb 2026
  • 134206141
  • EUR 5000000.00

Location for : Listing Title