General renovation of the Heppenheim district hospital - winter building heating
At the Bergstrasse District Hospital (abbreviated KKB) in Heppenheim, numerous measures are being carried out as part of the âGeneral Renovation KKBâ measure. Care wing J will be gutted and renovated; the new intensive care and general care will be located there. Component G will be demolished and a replacement building will be located there with a central emergency room, radiology and surgery department. Further sub-measures include: facade renovation; Drinking water renovation, upgrading of TGA centers, partial implementation of basic fire protection concept and construction of a new house handover point. Due to existing pollution, many of the rooms are only being gutted and dismantled as professionally as possible. The scope of services includes in particular: delivery, installation, maintenance, operation and dismantling of the complete winter building heating system, automatic temperature-controlled control using thermostats, provision of all necessary heating devices, distribution lines, warm air hoses and ancillary systems, maintenance, operation, monitoring and elimination of malfunctions, all operating, energy and fuel...
- 12 Oct 2026
- 149117937
- Refer Document