TendersPedia
Search
Subscribe

public-utility Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 2909

The object of the procurement is the heat production of the three (3) pellet heating centers in the city of Kangasala, including the procurement of fuels, the supply of thermal energy and the maintenance and upkeep of the heat production equipment (hereinafter referred to as the Service). The main fuel is pellet and the backup fuel is renewable oil used by oil boilers. The pellet heating centers owned by the city of Kangasala are located in the areas of Liuksiala, Ruutana and Haviseva. The requirements set for the service are specified in the request for tender and its in the attachments. Pellet heat production and service and maintenance of heat production equipment The object of the procurement is the heat production of three (3) pellet heating centers in the city of Kangasala, including the procurement of fuels, the delivery of thermal energy and service and maintenance of heat production equipment (hereinafter referred to as the Service). The main fuel is pellets and the backup fuel is renewable oil used by oil boilers. The pellet heating centers owned by the city of Kangasala are located in Liuksiala, Ruutana and In the areas of Haviseva. The requirements set for the service are specified in the request for tender and its attachments. Doc Title: Pellet heat production and service and maintenance of heat production equipment Contract Type: services

  • 16 Mar 2026
  • 135628810
  • Refer Document

The subject of the order is a comprehensive supply of natural gas, including sales and distribution for the facilities of the Multi-Specialty Hospital - SP ZOZ in Zgorzelec. A detailed description of the subject of the order is included in Annex No. 2, 3, 3A, 3B, 6 to SWZ. Numbering in accordance with SWZ: 2.1. The Ordering Party does not allow the submission of partial offers. JUSTIFICATION: The subject of the order is the supply of natural gas with established quality standards (Regulation of the Minister of Economy of July 2, 2010 regarding detailed conditions for the operation of the gas system, chapter 8 Β§ 38 section 1 (Journal of Laws of 2025, item 1382, as amended). Since a license is required to sell gas, entities participating in the tender must have one. No division of order no violates the principles of fair competition by limiting the ability of smaller entities to apply for the contract, because the only condition is to have a license and a contract enabling sales via the network distribution in accordance with the list of the Ordering Party's consumption points. 2.2. The Ordering Party does not allow the submission of equivalent offers. 2.3. The Ordering Party does not allow the submission of variant offers (Article 92 of the Act). 2.4. The Ordering Party does not envisage concluding a contract framework. 2.5. The Ordering Party does not envisage awarding the contract referred to in Art. 214 section 1 point 7 and 8 of the Act. 2.6. The Ordering Party does not provide for an electronic auction.2.7. The Ordering Party does not require a site visit or...

  • 27 Feb 2026
  • 135628599
  • Refer Document

COMPREHENSIVE SUPPLY (SALE AND PROVISION OF DISTRIBUTION SERVICES) OF GAS FUEL - HIGH-METANE NATURAL GAS (GROUP E) FOR THE SPECIALIZED HOSPITAL OF LUDWIK RYDYGIERA IN KRAKÓW SP... COMPREHENSIVE DELIVERY (SALES AND SERVICE DISTRIBUTION SERVICES OF GAS FUEL - HIGH-METANE NATURAL GAS (GROUP E) FOR THE SPECIALIZED HOSPITAL. LUDWIKA RYDYGIERA W KRAKÓW SP. Z O.O. AND FOR THE LONG-TERM CARE FACILITY IN MAKÓW PODHALAŃSKI 1.The subject of the order is comprehensive supply (sale and provision of distribution services) of gas fuel - high-methane natural gas (group E) for the Specialist Hospital. Ludwika Rydygiera w Krakowie Sp. z o. o. per estate Złota Jesieni 1, 31-826 Kraków, and for Long-term Care Facility in Maków Podhalański at ul. Mickiewicza 7, 34-220 Maków Podhalański, in accordance with the description and requirements contained in Annex No. 1A and 1B to these Specifications. 2. Information on the expected demand for gas fuel in broken down into months (in kWh) for each point is provided in Appendix 3 to the Specification. 3. Offers that do not include the full scope of the subject of the order will be rejected. 4. The remaining terms of the order are specified in the Draft Provisions of the Agreement contained in Chapter XVII Specification. COMPREHENSIVE SUPPLY (SALE AND PROVISION OF DISTRIBUTION SERVICES) OF GAS FUEL - HIGH-METANE NATURAL GAS (GROUP E) FOR THE SPECIALIZED HOSPITAL OF LUDWIKA RYDYGIERA W KRAKÓW SP. Z O.O. 1.The subject of the order is comprehensive supply (sale and provision of distribution services) of gas fuel - high-methane natural gas (group E) for the Specialist Hospital...

  • 23 Feb 2026
  • 135627463
  • Refer Document

1-2 drainage specialists to the middle region 1-2 drainage specialists in the middle region The customer is looking for 1-2 drainage specialists for the middle region with a total occupancy rate of 80-100% of an annual working time. Doc Title: 1-2 drainage specialists middle region Contract Type: services

  • 16 Mar 2026
  • 135621881
  • SEK 2720000

Infrastructure power supply supply channel east Power supply for the HLRS III high-performance computing center at the University of Stuttgart Development of the on-site HLRS III with medium voltage around 12 kV for a redundant transmission capacity of approx. 11.5 MVA. Departing from two existing ones The outgoing panels in the substation (AW) are used to lay a total of 4 medium-voltage systems a length of around 1000 m in a walkable supply channel built on site up to the HLRS III on cable ladders. The two fiber optic Cables for cable differential protection must be laid in a separate route. The HLRS III has two MS Systems must be drawn into empty pipes provided by the customer. The necessary laying systems must be set up, assembly primarily on site anchor rails. Im new The part of the supply canal that was built, length approx. 500 m, is not only equipped with the laying systems but also with the basic installation of light and power as well as the to equip associated distributions. The 0.4 kV feed to the sub-distributors takes place from the Waste heat center on outlet strips installed on site. 12,000 m N2XS(F)2Y 1x300/25mm2 Around 12kV 2,000 m fiber optic cable 2,800 m cable ladder 2 pcs sub-distributions 500 m 0.4 kV cable up to 4x70/35 2,500 m of installation cables 120 pcs. LED lights Doc title: University of Stuttgart, HLRS, III. Expansion stage infrastructure power supply east supply channel Contract Type: works

  • 12 Mar 2026
  • 135619569
  • EUR 1517630.25

Location for : Listing Title