TendersPedia
Search
Subscribe

public-utility Tenders in TendersPedia

Stay informed with the newest government and private tenders, bids, and contract announcements.

Results Count : 2911

The General Services and Central Stores Directorate would like to purchase the following: SWITCHBOARD VCB PANEL 11KV Consisting of four Type 1A, two Type 7A and one Type 8A to EDD Specification No S 4135 F Switchboard configured to attached drawing ES SLD 102, complete with battery, battery charger and spares All inter panel connection and wiring for each switchboard The RTU as per Clause 9.4 is excluded from scope of supply All automation devices and signals for RTU future installation, breakers, switches, relays and control signals alarms shall be pre wired to the marshalling box RTU interface connections to facilitate operation monitoring from SCADA system in future The NSN number must be printed on each packing box Qty: 1 Set, 65000000-3 - Public utilities

  • 01 Mar 2026
  • 135554491
  • BHD Refer Document

The purpose of this consultation is the delegation of the public service for the production and distribution of drinking water within the perimeter of the municipalities of Belleville, Champey-sur-Moselle, Maidières, Pagny-sur-Moselle, Pont-à-Mousson, Rogéville and Vittonville and in case of strengthening of the optional tranche (TO), the municipality of Atton. The consultation is carried out in accordance with the procedural rules provided for by the Public Procurement Code in articles L.1410-1 et seq. and R.1410-1 et seq., L.1411-1 et seq. and R.1411-1 et seq. of the General Code of Local Authorities. The management of the delegated service includes the operation, in particular the maintenance and monitoring of drinking water production and distribution installations (works, networks and network accessories, connections, meters), monitoring and controlling the quality of water produced and distributed, searching for anomalies likely to disrupt the proper functioning of the service and resolving these situations in the limits defined by the contract, the carrying out of the work charged to the Delegate by the contract and its subsequent modifications, the management of relations with the subscribers of the service and the information and technical assistance to the Community for allow him to control the service, in particular by transmitting precise and reliable data. Technical data of the service (2023/2024 or failing that 2020/2021): 8,679 subscribers; 974,060 m3 billed to subscribers...

  • 10 Apr 2026
  • 135533114
  • Refer Document

The contracting authority has the right to manage the construction of the D1 highway, which includes, in accordance with § 12, paragraph 5 of Act No. 13/1997 Coll., on Land Transport, as amended (hereinafter referred to as "ZPK"), the "Osek" highway rest area located at km 289.3 on the left of the D1 highway, located on the plot of park. No. 1628/1 in the cadastral territory of Osek nad Bečvou (hereinafter referred to as "Odpočivka"). The contracting authority is interested in the realization and subsequent operation of charging stations for heavy electric vehicles at Odpočivka by the concessionaire within charging park, which will provide users of the D1 highway with alternative fuels, primarily for electric vehicles with a maximum permitted weight of more than 3.5 tons. By awarding this concession, the contracting authority aims, among other things, to fulfill the conditions specified in the regulation of the European Parliament and of the Council (EU) 2023/1804 of 13/09/2023 on the introduction of infrastructure for alternative fuels and on the repeal of Directive 2014/94/EU (hereinafter referred to as the "AFIR Regulation"). The subject of the concession is defined in detail in the text of the Agreement and its annexes and constitutes it especially: processing of project documentation to the extent and under the conditions set by the Contract, execution of complete engineering activities in relation to obtaining planning permission for the implementation of construction modifications and the placement of charging stations and others permitted by the contracting authority objects, obtaining the related approval decision, ensuring the complete implementation of construction works and the installation of charging stations within the charging park within the specified period so that the charging p...

  • 16 Mar 2026
  • 135533105
  • CZK 715590000

1. The subject of the order is a comprehensive supply of electricity, including the sale of electricity and the provision of electricity distribution (transmission) services to the Ordering Party's facilities in accordance with the provisions of the Act of April 10, 1997 Law energetic.2. The ordering party places an order for complex services, within the meaning of Art. 3 point 30 of the Act of April 10, 1997 Energy Law (Journal of Laws of 2026, item 43), implemented on the basis of the comprehensive agreement referred to in Art. 5 section 3 of this Act. 3. The sale of electricity to the Ordering Party will be carried out in accordance with the provisions of the Act and in accordance with the implementing regulations issued to this Act, in particular with the Customer service standards specified in the Regulation of the Minister of Climate and Environment of of March 22, 2023 on detailed conditions for the operation of the power system (Journal of Laws of 2025, item 919, as amended), Regulation of the Minister of Climate and Environment of November 29, 2022 on the method of shaping and calculating tariffs and method of settlement in electricity trade (Journal of Laws of 2024, item 904, as amended), and also in accordance with Polish Standards.4. Contractor...

  • 20 Feb 2026
  • 135529818
  • Refer Document

This Information Memorandum and Prequalification Questionnaire has been prepared for the purpose of providing certain information to entities interested in applying to be pre-qualified for a competition for the award of a framework agreement for the provision on a lease basis of driver welfare facilities consisting of automated self-cleaning public conveniences for public transport operators, at various locations throughout Ireland. This competition is being conducted by the National Transport Authority on behalf of the following clients (collectively referred to as “Clients”, and each individually as a “Client”): • National Transport Authority (“NTA”) • Dublin Bus • Bus Éireann • Go Ahead, and • Any future PSO bus operator nominated by NTA from time to time. Tenders for contracts pursuant to the Framework Agreement may be issued by any of the Clients.
Doc Title: Prequalification Questionnaire for a Framework Agreement for the Supply, Installation, Operation and Maintenance of Driver Welfare Facilities
Contract Type: services

  • 28 Mar 2026
  • 135521414
  • EUR 23695000

This consultation is launched following the procedure: Open call for tenders - articles R.2124-2 1° and R.2161-2 to 5 of the Public Procurement Code. Its purpose is to manage existing charging infrastructures and their deployment for electric and plug-in hybrid vehicles IRVE Management of existing charging infrastructure and their deployment for electric and plug-in hybrid vehicles IRVE Description: Framework agreement for purchase orders: - Minimum amount: 250 000.00 Euros. Maximum amount: 6,000,000.00 Euros. In value in Euros excluding tax. Administration estimate excluding tax: 2,863,399.2 Euros (established over a period of 24 months). Duration (excluding renewal): 24 months. Number of possible renewals: 1. Start of the market : Start-up service order, in addition to the CCAG, this service order will be notified within a maximum period of 6 months from notification of the contract. The execution time for each service is indicated in the order form or where applicable in the C.C.T.P. Doc Title: 25N0821 - Management of existing charging infrastructure and their deployment for electric and plug-in hybrid vehicles IRVE Contract Type: services

  • 15 Apr 2026
  • 135520912
  • EUR 2863399.2

The city of Hattingen announces that the existing water concession agreement between the city of Hattingen and Stadtwerke Hattingen GmbH for the urban area with the exception of the districts of Blankenstein, Welper, Holthausen, Bredenscheid, Winz, Niederbonsfeld, Niederwenigern and part of Niederstüter expires on December 31, 2026. The city of Hattingen intends to conclude a new water concession agreement with a maximum term of 30 years. The water concession agreement to be concluded will... The contractual partner of the city of Hattingen is granted the right to use the road for the exclusive public water supply of end consumers in the above-mentioned area of ​​the city of Hattingen. At the same time, the contractual partner is obliged to provide the public To ensure water supply in the above-mentioned area of ​​the city of Hattingen during the term of the contract. Road usage agreement for the exclusive public water supply to final consumers in the area of the city of Hattingen Doc title: Road usage agreement for the exclusive public water supply to final consumers in the area of the city of Hattingen Contract Type: services

  • 28 Mar 2026
  • 135519711
  • Refer Document

Location for : Listing Title