Work for the Base Bid of the contract is for the construction of approximately 7,600 liner feet of water lines, services, fire hydrants, valves, fittings, connections and other appurtenances, as shown on the construction drawings, required by Project Manual and/or otherwise instructed by Engineer. The work also includes site and pavement restoration, tree removal and protection, storm water pollution prevention and traffic control in relation to the construction of the water lines.Work for the Alternate 1 Bid of the contract is for the construction of approximately 3,000 linear feet of water lines, service lines, fire hydrants, valves, fittings, connections, and other appurtenances, as shown on the construction drawings, required by Project Manual and/or otherwise instructed by Engineer. The work also includes site and pavement restoration, tree protection, storm water pollution prevention and traffic control in relation to the construction of the water lines.Work for the Alternate 2 Bid of the contract is for the construction of approximately 1,500 linear feet of water lines, service lines, fire hydrants, valves, fittings, connections, and other appurtenances, as shown on the construction drawings, required by Project Manual and/or otherwise instructed by Engineer. The work also includes site and pavement restoration, tree protection, storm water pollution prevention and traffic control in relation to the construction of the water lines.Please review the attached Invitation to Bid project manual and construction drawings.
- 26 Feb 2026
- 135574247
- Refer Document
